Search results

1 – 10 of over 17000
Article
Publication date: 5 February 2018

Shobhit Chaturvedi, Jitesh J. Thakkar and Ravi Shankar

As the construction industry undertakes complex and innovative projects, improving the labor productivity that helps accomplish the triple bottom line dimensions (time, schedule…

2770

Abstract

Purpose

As the construction industry undertakes complex and innovative projects, improving the labor productivity that helps accomplish the triple bottom line dimensions (time, schedule and performance) assumes greater importance. It is of even greater importance in developing countries like India where most of building construction takes place on a manual basis. In response, the purpose of this paper is to develop an evaluation framework for assessing the labor productivity in the construction industry. The application of the framework is demonstrated for the case of the Indian construction industry and key insights are reported.

Design/methodology/approach

The literature review and expert survey has helped to identify 4 main dimensions and 14 different factors affecting labor productivity in the construction industry. An application of Decision-Making Trial and Evaluation Laboratory was deployed to investigate into the causality of labor productivity dimensions.

Findings

The research delivers a quantitative labor productivity assessment framework for evaluating causal relationships among the factors influencing labor productivity in the construction industry. The result obtained for a typical case of the Indian construction industry showed that the safety at construction site has a profound effect on labor-related factors.

Originality/value

The paper makes two contributions in the domain of labor productivity assessment in the construction industry. First, it proposes an evaluation framework to investigate into the causal relationships among the labor productivity factors. This proposed framework is robust and can be used to compare the performance of different construction projects using an integrated approach proposed by this research. Such exploratory analysis would assist benchmarking studies. Second, it undertakes an empirical investigation for the Indian construction industry to develop key managerial insights and extend policy-related recommendations.

Details

Benchmarking: An International Journal, vol. 25 no. 1
Type: Research Article
ISSN: 1463-5771

Keywords

Article
Publication date: 12 April 2023

Arpit Singh, Vimal Kumar, Ankesh Mittal and Pratima Verma

This study aims to set out to identify and evaluate potential obstacles to successfully implementing lean construction (LC) as a result.

Abstract

Purpose

This study aims to set out to identify and evaluate potential obstacles to successfully implementing lean construction (LC) as a result.

Design/methodology/approach

Several indicators were recognized as major obstacles following an exhaustive assessment of the literature and a multicriteria decision analysis based on the analytic hierarchy process (AHP) of information obtained from a questionnaire survey that was directed to practitioners in the Indian construction industry.

Findings

The results of this AHP model suggest that “Managerial” and “Inadequate resources” categories with a priority weight of “0.361” and “0.309” have the highest levels of influence, respectively, while “Inadequate knowledge” and “just in time (JIT)” categories with a priority weight of “0.053” and “0.034” have the lowest levels of influence, respectively.

Research limitations/implications

Construction companies can use the study’s findings as a guide to determine whether they are ready to embrace LC, learn more about the components needed for implementation or investigate any challenges that may arise. These businesses can then create plans to promote the adoption and application of the lean philosophy.

Originality/value

The Indian construction industry may see great success with LC management initiatives. LC concepts have been adopted by many nations, but during the past 20 years, there has only appeared to be a limited amount of lean implementation in the Indian construction industry. It seems that several structural and cultural barriers are preventing its effective implementation. Organizations will not be able to determine what improvement efforts are required, where these efforts should be directed or which initiatives could provide the best outcomes if they are unaware of the elements that influence the effective implementation of LC.

Details

Construction Innovation , vol. 24 no. 1
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 9 July 2021

Deepthi Bendi, Muhammad Qasim Rana, Mohammed Arif, Steve Michael Lamb, Anil Sawhney and Amit Kant Kaushik

This paper aims to present factors affecting the Indian construction organisations in adopting off-site construction (OSC) methods.

Abstract

Purpose

This paper aims to present factors affecting the Indian construction organisations in adopting off-site construction (OSC) methods.

Design/methodology/approach

An existing readiness maturity model has been used to assess three large organisations in different parts of India. A case study methodology has been adopted in this paper to highlight critical issues in OSC adoption in India.

Findings

This paper presents three case studies and concludes the Indian construction sectors readiness to adopt the OSC methods. Through the case studies, different issues related to the adoption of OSC have been identified and highlighted for the Indian construction sector. Although the three companies are large, there are several small- and medium-sized enterprises (SME) operating in India's construction sector, and future research shall be needed to review these SMEs.

Research limitations/implications

This research study is broadly focused on developing and assessing an OSC readiness framework for Indian construction organisations. The research scope and the population for data collection are limited to large construction organisations in India only.

Practical implications

The proposed OSC readiness maturity model guides construction practitioners in India through a structured process to assess their OSC readiness in the market. This assessment enables them to evaluate and benchmark their processes through the strategic and operational phases. This research will add to the existing knowledge of OSC in India by mapping issues relevant to India's construction industry. The research has provided background on the status of OSC, the drivers and barriers affecting the implementation of OSC techniques in the Indian construction industry.

Originality/value

Through the three case studies, several factors related to the implementation of OSC methods have been identified and highlighted within the Indian construction sector. Although the model has been applied to the Indian construction sector, it can easily be modified to fit into other areas and similar dynamics and business conditions.

Details

Construction Innovation , vol. 22 no. 2
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 6 October 2020

Deepthi Bendi, Muhammad Qasim Rana, Mohammed Arif, Jack Steven Goulding and Anil Sawhney

This paper aims to present an off-site construction (OSC) readiness maturity model for assessing the readiness of offsite construction companies in the Indian construction sector.

Abstract

Purpose

This paper aims to present an off-site construction (OSC) readiness maturity model for assessing the readiness of offsite construction companies in the Indian construction sector.

Design/methodology/approach

The research was conducted in three stages. The first stage consisted of a detailed literature review to document 17 different variables affecting the OSC adoption in India. In Stage 2, 15 semi-structured interviews were carried out where the participants were asked to refine those variables for the Indian context and define what would be different levels of attainment. In the third stage, another set of 5 semi-structure interviews was performed to validate the maturity levels and definitions.

Findings

A three-level OSC readiness maturity model is presented for discussion. This describes 17 variables at different levels of maturity.

Practical Implications

The proposed OSC readiness maturity model guides construction practitioners in India through a structured process to enable them to assess their OSC readiness in the market. This assessment enables them to evaluate and benchmark their processes through the strategic and operational phases. The maturity model also identifies the areas of concern and the scope for further development or change to secure the optimal advantage of OSC methods.

Originality/value

The research produced a model to assess the readiness of OSC adoption in the Indian construction sector. Although the model has been applied to the Indian construction sector, it can easily be modified to accommodate other OSM contexts.

Article
Publication date: 27 March 2020

Deepthi Bendi, Muhammad Qasim Rana, Mohammed Arif, Jack Steven Goulding and Amit Kant Kaushik

This paper presents a bespoke model for understanding off-site construction (OSC) readiness among Indian construction organisations. This model presents 17 variables for…

Abstract

Purpose

This paper presents a bespoke model for understanding off-site construction (OSC) readiness among Indian construction organisations. This model presents 17 variables for discussion, the results from which help support OSC strategic decision-making.

Design/methodology/approach

Factor analysis was used to investigate the relationship between variables to group them into factors. After identifying 26 different variables, these were reduced to 17 using factor analysis and categorised into four groups. Descriptive statistical analysis and factor analysis using SPSS was used to develop a hierarchy of factors that affect OSC readiness in India. These findings were reinforced by five domain experts to support the results.

Findings

Minimising on-site duration, ensuring cost and time certainty and transportation issues were identified as the three most important factors, whereas lack of guidance and scepticism were among the lowest factors affecting the Indian OSC sector.

Research limitations/implications

This research is specifically focused on OSC within the Indian construction sector. As such, data collection, propagation and analysis should be constrained to the population context regarding inference, generalisability and repeatability.

Practical implications

The proffered OSC readiness model offers OSC practitioners an ability to assess the OSC readiness of construction organisations in India. This includes the evaluation and benchmarking of processes in both strategic and operational phases, including highlighting areas of concern and scope for further development (to achieve optimal advantage of OSC methods).

Originality/value

Originality rests with the use of factor analysis and descriptive statistical analysis to study the influence of different construction-related factors and variables on the OSC sector in India. This impact readiness model is context-specific to the Indian OSC sector – providing a unique insight into the causal factors and dependencies that can affect the adoption and uptake of modern methods of construction in India.

Details

Construction Innovation , vol. 21 no. 1
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 8 September 2023

Noopur

This study attempts to analyse and rank the impact of work-related issues arising within the Indian construction industry in the context of the existing pandemic. Furthermore…

Abstract

Purpose

This study attempts to analyse and rank the impact of work-related issues arising within the Indian construction industry in the context of the existing pandemic. Furthermore, this is the first attempt to provide strategies to overcome issues among a workforce that is highly contractual in nature and is currently witnessing the uncertainties of the pandemic's aftermath. To the best of the author's knowledge, few studies have highlighted the combined analysis of job insecurity, psychological stress and emotional exhaustion in the Indian construction industry.

Design/methodology/approach

The “Best Worst Methodology” (BWM) has been used in this study to analyse and rank the key factors that eliminate negative characteristics among contractual construction employees. The BWM, outlined by Rezaei (2015, 2016), is a popular “multi-criteria decision analysis technique” due to its advantage of consistent results and lesser pairwise data requirements.

Findings

The study identified and ranked the socioeconomic impact of the three waves of the COVID-19 pandemic on construction sector employees in the Indian subcontinent. The results indicate that job insecurity has the most prominent impact, which ultimately produces psychological stress and emotional exhaustion among employees.

Originality/value

To achieve the objective of identifying and prioritising the criteria of adverse socioeconomic impacts during the pandemic and outlining plans of action for the construction industry, ten experts (civil engineers/managers) from ten different construction projects were involved in a mixed-method case study, which has never been explored in the Indian construction sector.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 4 April 2016

Asadullah Khan and Maqsood Sandhu

The purpose of this paper is to benchmark national culture in the context of decent work practices in project-based industry of the United Arab Emirates (UAE). This should help in…

1397

Abstract

Purpose

The purpose of this paper is to benchmark national culture in the context of decent work practices in project-based industry of the United Arab Emirates (UAE). This should help in achieving successful short-term migration. The study also aims to validate the decent work practice indicators for Bangladeshi, Chinese, Indian and Pakistani construction labourers working in the UAE.

Design/methodology/approach

This study takes an ethnographic approach in its qualitative research methodology. The research involves observational methodology for its data collection during the execution of construction projects, semi-structured interviews to confirm the data collection during observational approach and a narrative methodology for the data collection within the labour camps, grassy fields and town streets. The qualitative data were expressed in quantitative terms to signify statistically the effect of the national culture in the context of decent work practices in this industry. Hence, the research involved triangulation in its data collection and analysis.

Findings

The study reveals that the national cultures of the migrant construction labourers in this context are not the same as identified by Geert Hofstede about four decades earlier. It was found that Indians were high in uncertainty avoidance, Pakistani construction labourers were high in masculinity, Bangladeshi construction labourers were low in long-term orientation (LTO) and individualism and Chinese labourers were found to have high individualism and LTO. This study verified decent work practice indicators for Indian, Pakistani and Bangladeshi construction labourers and identified different decent work practice indicators for Chinese construction labourers in the UAE than Indian, Pakistani and Bangladeshi construction labourers.

Research limitations/implications

The study was limited to the construction labourers in the UAE. The data were collected during observation while execution construction projects and limited to visiting construction labour camps, grassy fields and town streets.

Practical implications

The differences in the national culture of the migrant construction labourers and the decent construction practices in the UAE have economic, social and environmental implications for construction labourers in the Arab world, for both migrant sending and receiving countries. Understanding and managing various national cultures and improving prevalent decent work practices would help to improve economic and social condition of the migrant construction labourers and help to arrest the advance of looming health problems.

Originality/value

The study identifies the national cultures of the migrant construction labourers in the context of decent work practices in the UAE. Improvement in the decent work practices of the migrant sending countries and the UAE and understanding of the culture of the migrants will help in preparing effective migration policy by both migrant sending and receiving countries. No study was found to have identified national cultures in the context of decent work practices and assessed the need for improvement in this regard.

Details

Benchmarking: An International Journal, vol. 23 no. 3
Type: Research Article
ISSN: 1463-5771

Keywords

Article
Publication date: 8 March 2021

Arpit Singh, Subhas C. Misra, Vinod Kumar and Uma Kumar

The purpose of this paper is to propose a practical framework to measure the safety performance of workers in the Indian construction industry. The key safety performance…

520

Abstract

Purpose

The purpose of this paper is to propose a practical framework to measure the safety performance of workers in the Indian construction industry. The key safety performance indicators are identified and ordered on the premise that the higher order assignment of an indicator implies a strong indication of an effective safety performance.

Design/methodology/approach

Various indicators of safety performance in the construction industry were identified from extant literature review combined with author's personal viewpoint. The identified variables were inquired for appropriateness for the Indian construction scenario by consultation with experts. Fuzzy Technique for order preference by similarity to ideal solution (TOPSIS) technique was considered for the ranking of the indicators from most to least important.

Findings

The most important highlight of the study was the importance of the role of management by participating in informing workers about the safety rules and compliance toward safety measures. Proper and timely safety training to the workers and equipping them with sophisticated safety equipment for daily activities is perceived to be highly important in ensuring a safe and healthy workplace environment. Controlling the absenteeism rate reduces the burden of extra work on the employees, thereby, encouraging safe work-related behavior.

Originality/value

Senior management should make safety induction programs compulsory at the time of joining of the employees. The guidelines for safety practices, rules and information about the safety equipment should be properly documented and arranged in safety manuals. Periodical drills involving visual demonstration of the safety practices should be followed to ensure safety at workplace.

Details

International Journal of Quality & Reliability Management, vol. 39 no. 1
Type: Research Article
ISSN: 0265-671X

Keywords

Article
Publication date: 18 May 2021

Vigneshkumar Chellappa, Vasundhara Srivastava and Urmi Ravindra Salve

Construction workers’ health and safety (CWHS) research in India has not gained much attention among researchers. This study aims to review articles related to CWHS research in…

Abstract

Purpose

Construction workers’ health and safety (CWHS) research in India has not gained much attention among researchers. This study aims to review articles related to CWHS research in India using a science mapping approach.

Design/methodology/approach

A total number of 64 journal articles published between 2004 and 2019 were extracted from the Scopus database using keywords including “construction safety,” “occupational health,” “ergonomics in construction,” etc. VOSviewer software was used to examine the influential keywords, documents, sources and authors in the field of CWHS.

Findings

The study found that most of the current work focuses on safety management, safety climate, safety performance, musculoskeletal disorders and behavior-based safety. The result indicates no theoretical basis for the theories and learning methods for the existing studies.

Practical implications

The findings open up a research gap that researchers explore to enhance workers’ health and safety within the Indian construction environment.

Originality/value

The paper is the first article to provide a better understanding of current research in the field of CWHS in India by analyzing its growth through the science mapping approach.

Details

Journal of Engineering, Design and Technology , vol. 19 no. 6
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 29 January 2020

Satish Kumar Viswanathan and Kumar Neeraj Jha

International construction projects encompass various risks, and it is essential to evaluate and manage them to achieve project and firms’ success. As approaches to addressing…

1688

Abstract

Purpose

International construction projects encompass various risks, and it is essential to evaluate and manage them to achieve project and firms’ success. As approaches to addressing international market risks vary from one country to another, the purpose of this paper is to identify the critical risk factors of embarking on international construction projects according to Indian experiences.

Design/methodology/approach

After primarily verifying the identified 26 risk variables, a questionnaire survey was conducted to draw upon the views of experts who possess international project experience. The 105 responses were analyzed using univariate and multivariate techniques. An analysis of variance identified the significant variables that influence overall performance on international construction projects, which were then grouped according to underlying relationships using factor analysis to determine the specific risk factors. Furthermore, considering these risk factors as independent variables and overall project performance as a dependent variable, a stepwise regression analysis was carried out to identify relatively critical risk factors.

Findings

The results revealed that of the identified four risk factors, the project-specific risk factor emerged as the foremost critical risk factor, the economic and market-specific risk factor was the second most critical risk factor, the firm-specific risk factor was the third most critical risk factor and the political-specific risk factor was the least critical risk factor. These findings were also validated appropriately.

Research limitations/implications

This study was limited to the data acquired from Indian construction firms, predominantly consultants and contractors. Though the survey respondents possessed adequate familiarity in international construction, commonly perceived limitations in self-reported surveys such as the lack of conscientious responses and reporting bias were not an exception in this research.

Practical implications

The risk factors and their criticality – as identified in this study – can aid the multinational firms and international aspirants to prioritize the critical aspects and develop a suitable risk mitigation strategy to achieve greater project success in international market.

Originality/value

By investigating the various risk factors that influence overall performance of international construction projects, this research considerably contributes to the body of knowledge pertaining to international construction risk management that will enable firms from India and similar developing nations to emphasize on critical risk factors.

Details

Engineering, Construction and Architectural Management, vol. 27 no. 5
Type: Research Article
ISSN: 0969-9988

Keywords

1 – 10 of over 17000