Search results

1 – 10 of 15
Book part
Publication date: 23 September 2022

Temidayo Oluwasola Osunsanmi, Clinton Ohis Aigbavboa, Wellington Didibhuku Thwala and Ayodeji Emmanuel Oke

This chapter aimed to uncover the gaps in the existing construction supply chain management (CSCM) models. Organisational culture and the fourth industrial revolution (4IR…

Abstract

This chapter aimed to uncover the gaps in the existing construction supply chain management (CSCM) models. Organisational culture and the fourth industrial revolution (4IR) components are the two gaps that were identified through reviewing existing CSCM models. The 4IR is driven by three components which are smart management, virtualisation and cyber-physical system. It was proposed in this chapter that the practice of CSCM should be in tandem with the components of 4IR. This chapter recommended that for the effective practice of the construction supply chain (CSC) in the 4IR era, construction stakeholders should adopt an innovative and collaborative organisational culture. The organisational culture adopted by a construction firm performs a crucial role in encouraging construction stakeholders in adopting 4IR components for CSCM. Each of the 4IR components is driven by technologies like autonomous robots, building information modelling (BIM), radio frequency identification (RFID), the internet of things (IoT) and others. Among all the technologies, it was discovered that RFID and BIM had gained prominence in most CSC literature. The chapter recommended that blockchain, digital twins and the cyber-physical system are the next trending technology for CSCM.

Details

Construction Supply Chain Management in the Fourth Industrial Revolution Era
Type: Book
ISBN: 978-1-80382-160-3

Keywords

Article
Publication date: 18 October 2023

Temidayo O. Osunsanmi, Chigozie Collins Okafor and Clinton Ohis Aigbavboa

The implementation of smart maintenance (SM) has greatly benefited facility managers, construction project managers and other stakeholders within the built environment…

Abstract

Purpose

The implementation of smart maintenance (SM) has greatly benefited facility managers, construction project managers and other stakeholders within the built environment. Unfortunately, its actualization for stakeholders in the built environment in the fourth industrial revolution (4IR) era remains a challenge. To reduce the challenge, this study aims at conducting a bibliometric analysis to unearth the critical success factors supporting SM implementation. The future direction and practice of SM in the construction industry were also explored.

Design/methodology/approach

A bibliometric approach was adopted for reviewing articles extracted from the Scopus database. Keywords such as (“smart maintenance“) OR (“intelligent maintenance”) OR (“technological maintenance”) OR (“automated maintenance”) OR (“computerized maintenance”) were used to extract articles from the Scopus database. The studies were restricted between 2006 and 2021 to capture the 4IR era. The initial extracted papers were 1,048; however, 288 papers were selected and analysed using VOSviewer software.

Findings

The findings revealed that the critical success factors supporting the implementation of SM in the 4IR era are collaboration, digital twin design, energy management system and decentralized data management system. Regarding the future practice of SM in the 4IR era, it was also revealed that SM is possible to evolve into maintenance 4.0. This will support the autonomous maintenance of infrastructures in the built environment.

Research limitations/implications

The use of a single database contributed to the limitation of the findings from this study.

Practical implications

Despite the limitations, the findings of this study contributed to practice and research by providing stakeholders in the built environment with the direction of SM practice.

Originality/value

Stakeholders in the built environment have clamoured to implement SM in the 4IR era. This study provided the critical success factors for adopting SM, guaranteeing the 4IR era. It also provides the research trends and direction of SM practice.

Details

Journal of Facilities Management , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1472-5967

Keywords

Book part
Publication date: 23 September 2022

Temidayo Oluwasola Osunsanmi, Clinton Ohis Aigbavboa, Wellington Didibhuku Thwala and Ayodeji Emmanuel Oke

The idea of implementing supply chain management (SCM) principles for the construction industry was embraced by construction stakeholders to enhance the sector's performance. The…

Abstract

The idea of implementing supply chain management (SCM) principles for the construction industry was embraced by construction stakeholders to enhance the sector's performance. The analysis from the literature revealed that the implementation of SCM in the construction industry enhances the industry's value in terms of cost-saving, time savings, material management, risk management and others. The construction supply chain (CSC) can be managed using the pull or push system. This chapter also discusses the origin and proliferation of SCM into the construction industry. The chapter revealed that the concept of SCM has passed through five different eras: the creation era, the use of ERP, globalisation stage, specialisation stage and electronic stage. The findings from the literature revealed that we are presently in the fourth industrial revolution (4IR) era. At this stage, the SCM witnesses the adoption of technologies and principles driven by the 4IR. This chapter also revealed that the practice of SCM in the construction industry is centred around integration, collaboration, communication and the structure of the supply chain (SC). The forms and challenges hindering the adoption of these practices were also discussed extensively in this chapter.

Details

Construction Supply Chain Management in the Fourth Industrial Revolution Era
Type: Book
ISBN: 978-1-80382-160-3

Keywords

Article
Publication date: 30 August 2022

Prince Boateng, Temitope Omotayo, Temidayo Osunsanmi and Damilola Ekundayo

The inherent risks and their interactive impacts in megaproject development have been found in numerous cases worldwide. Although risk management standards have been recommended…

Abstract

Purpose

The inherent risks and their interactive impacts in megaproject development have been found in numerous cases worldwide. Although risk management standards have been recommended for the best practice in engineering construction projects, there is still a lack of systematic approaches to describing the interactions. Interactions such as social, technical, economic, ecological and political (STEEP) risks have complex and dynamic implications for megaproject construction. For a better understanding and effective management of megaprojects such as the Edinburgh Tram project, the dynamic interaction of concomitant risks must be studied.

Design/methodology/approach

A systems dynamic methodology was adopted following the comprehensive literature review. Documentary data were gathered from the case study on Tram Network Project in Edinburgh.

Findings

A casual loop of typical evolution of key indicators of risks was then developed. A hypothesised model of social and ecological (SE) risks was derived using the system dynamics (SD) modelling technique. The model was set up following British Standards on risk management to provide a generic tool for risk management in megaproject development. The study reveals that cost and time overruns at the developmental stage of the case project are caused mainly by the effects of interactions of risk factors from the external macro project environment on a timely basis.

Originality/value

This article presented a model for simulating the socio-ecological risk confronting the management and construction of megaprojects. The use of SD provided the opportunity to explain the nature of all risks, particularly the SE risks in the past stages of project development.

Details

International Journal of Building Pathology and Adaptation, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2398-4708

Keywords

Book part
Publication date: 23 September 2022

Temidayo Oluwasola Osunsanmi, Clinton Ohis Aigbavboa, Wellington Didibhuku Thwala and Ayodeji Emmanuel Oke

This chapter presented the model for the effective practice of construction supply chain management (CSCM) in the fourth industrial revolution (4IR) era. The model was developed…

Abstract

This chapter presented the model for the effective practice of construction supply chain management (CSCM) in the fourth industrial revolution (4IR) era. The model was developed after discovering that the failure of adopting the 4IR component has hindered the synchronisation of construction supply chain (CSC) activities. While some stakeholders are willing to manage their CSC under the 4IR era, most have no clue how to go about it. Most stakeholders are familiar with an existing practice built around collaboration, integration, supply chain structure and trust. This chapter bridges the gap by introducing organisational culture and 4IR components for modelling the CSCM in the 4IR era. The model was backed and grounded with a robust theoretical framework. The theories include social identity theory, change theory and resource-based view theory. It was discovered that the organisational culture adopted by construction stakeholders determines their willingness to embrace the 4IR component for the management of CSC. The 4IR components were divided into smart management, virtualisation and cyber-physical systems. The chapter recommended that the practice of SCM in the Nigerian construction industry should be modelled around the six constructs that were used in developing the model for this study.

Details

Construction Supply Chain Management in the Fourth Industrial Revolution Era
Type: Book
ISBN: 978-1-80382-160-3

Keywords

Book part
Publication date: 23 September 2022

Temidayo Oluwasola Osunsanmi, Clinton Ohis Aigbavboa, Wellington Didibhuku Thwala and Ayodeji Emmanuel Oke

The construction industry's application of supply chain management (SCM) principles is confronted with numerous Gordian Knots ranging from late delivery, fragmentation and others…

Abstract

The construction industry's application of supply chain management (SCM) principles is confronted with numerous Gordian Knots ranging from late delivery, fragmentation and others. The challenges could be attributed to multiple factors. The most crucial amongst them are adopting management ideas rooted in the second and third industrial revolution without taking consideration of the present industrial revolution. Evidence from literature and practice revealed that we are presently in the fourth industrial revolution (4IR). This chapter calls for developing a model that supports construction supply chain management (CSCM) in tandem with the principles of 4IR. This chapter presents the idea behind the conception, development and benefit of this research book to construction stakeholders and academia. The various shortcomings in the existing model for CSCM were also discussed in this chapter extensively.

Details

Construction Supply Chain Management in the Fourth Industrial Revolution Era
Type: Book
ISBN: 978-1-80382-160-3

Keywords

Book part
Publication date: 23 September 2022

Temidayo Oluwasola Osunsanmi, Clinton Ohis Aigbavboa, Wellington Didibhuku Thwala and Ayodeji Emmanuel Oke

This chapter focused on presenting the result of the Delphi study from the questionnaire distributed to the experts. The Delphi technique was used for modelling the construction…

Abstract

This chapter focused on presenting the result of the Delphi study from the questionnaire distributed to the experts. The Delphi technique was used for modelling the construction supply chain management (CSCM) practice in the fourth industrial revolution (4IR) era. The technique was also used to predict the supply chain management's (SCM) possible trends in the construction industry. A total of 15 experts were selected for this study based on their working experience. The Delphi study also validated the gaps (organisational culture and 4IR component) identified from the existing CSCM model. The findings from the Delphi study revealed that organisational culture has a significant impact on the practice of CSCM in the 4IR era. Regarding adopting the 4IR component for the CSCM in Nigeria, the Delphi study revealed that smart management and virtualisation are the most adopted. Unfortunately, the cyber-physical system, the heartbeat of the 4IR, is yet to be fully implemented for CSCM practice in the Nigerian construction industry.

Details

Construction Supply Chain Management in the Fourth Industrial Revolution Era
Type: Book
ISBN: 978-1-80382-160-3

Keywords

Article
Publication date: 6 January 2023

Temidayo Oluwasola Osunsanmi, Timothy O. Olawumi, Andrew Smith, Suha Jaradat, Clinton Aigbavboa, John Aliu, Ayodeji Oke, Oluwaseyi Ajayi and Opeyemi Oyeyipo

The study aims to develop a model that supports the application of data science techniques for real estate professionals in the fourth industrial revolution (4IR) era. The present…

473

Abstract

Purpose

The study aims to develop a model that supports the application of data science techniques for real estate professionals in the fourth industrial revolution (4IR) era. The present 4IR era gave birth to big data sets and is beyond real estate professionals' analysis techniques. This has led to a situation where most real estate professionals rely on their intuition while neglecting a rigorous analysis for real estate investment appraisals. The heavy reliance on their intuition has been responsible for the under-performance of real estate investment, especially in Africa.

Design/methodology/approach

This study utilised a survey questionnaire to randomly source data from real estate professionals. The questionnaire was analysed using a combination of Statistical package for social science (SPSS) V24 and Analysis of a Moment Structures (AMOS) graphics V27 software. Exploratory factor analysis was employed to break down the variables (drivers) into meaningful dimensions helpful in developing the conceptual framework. The framework was validated using covariance-based structural equation modelling. The model was validated using fit indices like discriminant validity, standardised root mean square (SRMR), comparative fit index (CFI), Normed Fit Index (NFI), etc.

Findings

The model revealed that an inclusive educational system, decentralised real estate market and data management system are the major drivers for applying data science techniques to real estate professionals. Also, real estate professionals' application of the drivers will guarantee an effective data analysis of real estate investments.

Originality/value

Numerous studies have clamoured for adopting data science techniques for real estate professionals. There is a lack of studies on the drivers that will guarantee the successful adoption of data science techniques. A modern form of data analysis for real estate professionals was also proposed in the study.

Details

Property Management, vol. 42 no. 2
Type: Research Article
ISSN: 0263-7472

Keywords

Book part
Publication date: 23 September 2022

Temidayo Oluwasola Osunsanmi, Clinton Ohis Aigbavboa, Wellington Didibhuku Thwala and Ayodeji Emmanuel Oke

The challenges confronting the Nigerian construction industry which led to the adoption of supply chain management (SCM) practice were evaluated in this chapter. It was discovered…

Abstract

The challenges confronting the Nigerian construction industry which led to the adoption of supply chain management (SCM) practice were evaluated in this chapter. It was discovered that the Nigerian construction industry is confronted with fragmentation and poor information management. The stakeholders within the Nigerian construction industry proposed the adoption of SCM to overcome the fragmentation and other shenanigans facing the industry. This chapter revealed that construction supply chain (CSC) practices within the Nigerian construction industry focus on waste elimination by adopting the lean concept. The focus on the lean concept could be attributed to the numerous research related to lean or the enormous waste emanating from the Nigerian construction industry. Regardless of the emphasis on lean, the Nigerian CSC is still confronted with fragmentation and heavy waste generation. Thus, this chapter proposed the adoption of principles and technologies driven by the fourth industrial revolution (4IR) is a paradigm shift for the management of CSC in the country. It was discovered in this chapter that Nigerian construction supply stakeholders had not embraced the technologies and principles of the 4IR. The failure to adopt the technologies driven by the 4IR is attributed to the absence of a CSC model that depicts the management of CSC in alignment with the 4IR. This chapter called for developing a SCM model for the Nigerian construction industry in tandem with the principles and technologies of the 4IR.

Details

Construction Supply Chain Management in the Fourth Industrial Revolution Era
Type: Book
ISBN: 978-1-80382-160-3

Keywords

Book part
Publication date: 23 September 2022

Temidayo Oluwasola Osunsanmi, Clinton Ohis Aigbavboa, Wellington Didibhuku Thwala and Ayodeji Emmanuel Oke

The opinion that the spiritual controls the physical gave rise to this chapter. The spiritual in this chapter was regarded as the philosophical and organisational theories…

Abstract

The opinion that the spiritual controls the physical gave rise to this chapter. The spiritual in this chapter was regarded as the philosophical and organisational theories controlling the practical aspect of construction supply chain management (CSCM). It was discovered that there is a significant omission in adopting theories to explain supply chain management's (SCM) adaptation and modelling in the construction industry. Therefore, this chapter reviews theories such as resource-based view theory (RBV), principal agency theory (PAT), resource dependency theory (RDT), transaction cost economics theory (TCE) and game theory. Each of the theories was analysed to uncover how they support the practice and variables for modelling the construction supply chain (CSC). The existing models of the CSC were also examined in this chapter. It was found that most models were developed drawing on the frameworks of the global supply chain forum (GSCF) and supply chain operations reference model (SCOR). Owing to the shortcoming of GSCF, this book adopted the framework and principles of SCOR for modelling the management of CSC in the era of the fourth industrial revolution (4IR). Also, most of the existing CSC models, such as the seamless CSCM model, maturity model and others, were developed using the SCOR framework.

Details

Construction Supply Chain Management in the Fourth Industrial Revolution Era
Type: Book
ISBN: 978-1-80382-160-3

Keywords

1 – 10 of 15