Article
Publication date: 3 October 2016

Ghaleb J. Sweis, Mohammad Hiyassat and Fares F. Al-Hroub

There is little information existing about the spread of lean among Jordanian construction companies. Building on a report by Diekmann et al. (2004), this paper aims to perform a…

Abstract

Purpose

There is little information existing about the spread of lean among Jordanian construction companies. Building on a report by Diekmann et al. (2004), this paper aims to perform a similar investigation among first-grade Jordanian construction companies to assess the extent of implementation of lean techniques.

Design/methodology/approach

For this purpose, a quantitative approach to measuring contractors’ conformance to lean practices was adopted. A survey of 61 contractors was conducted using both e-mails and personally delivered surveys that were completed on the spot. The results were analysed, and a practice value index, which indicates the level of implementation, was figured out for lean practices. In addition, an analysis of variance was conducted to determine whether there were differences among respondents from different construction fields.

Findings

The survey indicated that some procedures used by Jordanian contractors were consistent with lean construction practices. However, there was no proof that lean concepts were used on a company-wide basis. Furthermore, the survey revealed that the Jordanian construction industry lacks a “continuous improvement“ mentality, suffers from the absence of error proofing devices and provides minimal training at several levels of the organisation.

Originality/value

The outcomes of the study are valuable for contractors and developers of management practices, as it will encourage them to adopt lean construction holistically and identify features that are not exploited in the Jordanian construction industry.

Article
Publication date: 10 July 2009

Malek Abu Rumman, Mohammad Hiyassat, Bashar Alsmadi, Ahmad Jamrah and Maha Alqam

The purpose of this paper is to assess the long‐term ability of the Integrated Southern Ghor Project (ISGP) to meet the required water demands, assess the resulting energy…

Abstract

Purpose

The purpose of this paper is to assess the long‐term ability of the Integrated Southern Ghor Project (ISGP) to meet the required water demands, assess the resulting energy requirements, pumping costs, water transfers, benefits of the current system with respect to predevelopment conditions and effect of projected water demands increase on the resulting water deficits.

Design/methodology/approach

A surface water resources management model is developed using dynamic programming. The model inputs are the hydrological inflows from the different wadis in the project area, reservoirs characteristics and evaporation rates, system water demands. The model outputs are water deficits at the different demand areas, reservoirs storage and release sequences, water transfers and energy requirements and the associated costs. The average annual values of different performance criteria with the annual frequency curves are used to evaluate the implications of different water scenarios on the ISGP.

Findings

The results show the efficiency of the ISGP model in reducing the water deficits in the demand areas as compared to predevelopment conditions. Increased demand scenario showed the importance of finding new water projects to supplement the Southern Ghor Area in the future in order to meet the increasing water demands. The proposed water transfer will reduce the resulting deficits at the agricultural areas without the expenses of increasing the water deficits at other demand areas. The application of this model is expected to enhance decision making regarding water policies in Jordan.

Originality/value

This paper provides critical quantitative information to decision makers in Jordan about the potential of the different storage facilities and proposed transfers in meeting the required water demands in the Southern Ghor Project and assesses the required energy for that. This can help decision makers to have a holistic view about the expected water deficits in the area and therefore assist them in determining the areas impacted most and what alternative solution to use. The paper also shows the importance of using optimal control/management models to support water resources decision making in Jordan.

Details

Construction Innovation, vol. 9 no. 3
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 19 February 2018

Muhammad T. Hatamleh, Mohammed Hiyassat, Ghaleb Jalil Sweis and Rateb Jalil Sweis

Cost estimating process is an important element within the project life cycle. Comprehensive information, expanded knowledge, considerable expertise, and continuous improvement…

4428

Abstract

Purpose

Cost estimating process is an important element within the project life cycle. Comprehensive information, expanded knowledge, considerable expertise, and continuous improvement are needed to obtain accurate cost estimation. The purpose of this paper is to identify the critical factors that affect accuracy of cost estimation and evaluate the degree to which these factors are important from contractors’ and consultants’ viewpoints.

Design/methodology/approach

Qualitative and quantitative research approaches were adopted in collecting and analyzing the data, and testing the hypotheses. Based on the literature review, a questionnaire was prepared and then was modified according to the results of face-to-face open-ended interviews conducted with 11 project managers. The final version of the questionnaire was distributed to a random sample of 265 respondents. For analyzing the collected data Kendall’s and Mann-Whitney tests were conducted.

Findings

The analysis revealed that there is a strong agreement between contractors and consultants in the ranking of the factors related to consultant, contractor, design parameters, and information. A slightly weak agreement between contractors and consultants was noted regarding the factors related to market conditions (external factors) and factors related to project characteristics. Furthermore, the results show that the top ten factors affecting the accuracy of cost estimate are clear and detail drawings and specification, pricing experience of construction projects, perception of estimation importance, equipment (cost/availability/performance), project complexity, clear scope definition, accuracy and reliability of cost information, site constraints (access, storage, services), material availability, financial capabilities of the client, and availability of database of bids on similar project (historical data).

Originality/value

Offers an original view of the concept of accuracy of cost estimates as it relates to the efficiency of the project relying on both literature review and empirical evidence.

Details

Engineering, Construction and Architectural Management, vol. 25 no. 1
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 21 May 2024

Mohammad Alnadi, Patrick McLaughlin and Ismail Abushaikha

This paper aims to identify leadership behaviours in the manufacturing sector in Jordan that enable successful Lean Six Sigma implementation.

Abstract

Purpose

This paper aims to identify leadership behaviours in the manufacturing sector in Jordan that enable successful Lean Six Sigma implementation.

Design/methodology/approach

Qualitative data were collected through 27 interviews to identify the leadership behaviours that facilitate Lean Six Sigma and a focus group to categorise the aspects by grouping them into themes. A grounded theory approach was used in the field study. The processes of constant comparisons helped in identifying the relevant aspects of leadership behaviours and integrating specific aspects into themes; these processes were iteratives. Therefore, this research project relies on the grounded theory methodology to collect and analyse the data. The authors also used a focus group to categorise the aspects by grouping them into themes. In that, the aspects were grouped around core categories.

Findings

After analysing the data, 36 aspects have emerged. The data analysis processes helped in discovering the aspects of leadership that support the use of Lean Six Sigma in the manufacturing sector in Jordan. The aspects were developed through an iterative process of analysis until the saturation level was reached. Eight themes that influence the successful use of Lean Six Sigma emerged: Training and development; Continuous improvement and development; Communication; Empowering employees; Motivating employees; Managing qualities and operations; Employees engagement and involvement; and Supporting culture

Research limitations/implications

There are some research limitations to this study, which opens avenues for future research. First, the data was collected through qualitative methods, which limits the generalizability of the results. Future studies are needed to generalize the results to the wider business community. Second, the data was collected only from manufacturing organizations and did not consider other sectors. Future researchers are urged to replicate the study in other sectors. Third, this study considered only Jordanian firms; therefore, the authors call upon further research to investigate other national settings that may have a different business culture.

Practical implications

This study encourages businesses to follow and adopt these behaviours in organisations, which can help in developing desirable behaviours among leaders to reach advanced levels in using Lean Six Sigma. Moreover, practitioners can develop training programmes for developing leaders. Thus, the Lean Six Sigma journey can become smoother by addressing the issues that face practitioners during the different phases of implementing Lean Six Sigma. In that respect, the practical implication of this research is to describe the practices that the leadership of organisations must develop to maintain high levels of Lean Six Sigma deployment.

Originality/value

Scholarly studies in this field are scarce, especially in developing countries, so identifying the leadership behaviours can help researchers create a theory of leadership behaviours for Lean Six Sigma. Furthermore, practitioners of Lean Six Sigma can take into account these behaviours as crucial to the effective use of Lean Six Sigma. They can encourage leaders to follow and adopt these behaviours in organisations which can help in developing desirable behaviours among leaders to reach advanced levels in using Lean Six Sigma. Thus, the Lean Six Sigma journey can become smoother by addressing the issues that practitioners face during the different phases of implementing Lean Six Sigma.

Details

International Journal of Lean Six Sigma, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2040-4166

Keywords

Article
Publication date: 10 August 2023

K.I.L. Abhayantha, B.A.K.S. Perera, H.A.H.P. Perera and Roshani S. Palliyaguru

Environmental risks (ERs) are critical to any highway construction project (HCP). One of the main contracting parties responsible for ERs is the contractor. Hence, it has been…

Abstract

Purpose

Environmental risks (ERs) are critical to any highway construction project (HCP). One of the main contracting parties responsible for ERs is the contractor. Hence, it has been crucial to look into ways to control ERs in HCPs from the contractor’s perspective. This study aims to investigate how ERs can be managed in HCP in Sri Lanka.

Design/methodology/approach

A quantitative research approach with three rounds of Delphi was used. Statistical techniques were used to analyse and validate the ERs, the parties to whom the risks were to be allocated, and risk management measures identified from the empirical data collection.

Findings

The study reveals the 11 most significant ERs for HCP. Further, the most significant ERs in HCP were mainly found to be the responsibility of contractors in Sri Lanka. Twenty-four most appropriate risk response measures were determined; 13 were found to be common measures that could be used to manage two or more risks, while the remaining 11 were unique to specific risks.

Originality/value

Overall, this research determines the most significant ERs in HCP, the best risk allocation among the parties and appropriate risk-handling strategies and measures for each significant ERs. Additionally, the study addresses the demand for ERs management in HCP.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 22 January 2024

Heba Al Kailani, Ghaleb J. Sweis, Farouq Sammour, Wasan Omar Maaitah, Rateb J. Sweis and Mohammad Alkailani

The process of predicting construction costs and forecasting price fluctuations is a significant and challenging undertaking for project managers. This study aims to develop a…

Abstract

Purpose

The process of predicting construction costs and forecasting price fluctuations is a significant and challenging undertaking for project managers. This study aims to develop a construction cost index (CCI) for Jordan’s construction industry using fuzzy analytic hierarchy process (FAHP) and predict future CCI values using traditional and machine learning (ML) techniques.

Design/methodology/approach

The most influential cost items were selected by conducting a literature review and confirmatory expert interviews. The cost items’ weights were calculated using FAHP to develop the CCI formula.

Findings

The results showed that the random forest model had the lowest mean absolute percentage error (MAPE) of 1.09%, followed by Extreme Gradient Boosting and K-nearest neighbours with MAPEs of 1.41% and 1.46%, respectively.

Originality/value

The novelty of this study lies within the use of FAHP to address the ambiguity of the impact of various cost items on CCI. The developed CCI equation and ML models are expected to significantly benefit construction managers, investors and policymakers in making informed decisions by enhancing their understanding of cost trends in the construction industry.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 3 May 2023

Ala'a Saleh Alshdiefat, Ahlam Ammar Sharif, Albara' Ibrahim Alharahsheh, Shaban Ismael Albrka, Nils O.E. Olsson, Mohammad Younes and Sofie Bang

The purpose of this study is to explore the multifaceted challenge of managing construction and demolition waste within the context of the Jordan construction industry.

Abstract

Purpose

The purpose of this study is to explore the multifaceted challenge of managing construction and demolition waste within the context of the Jordan construction industry.

Design/methodology/approach

Using data sourced through desk research, interviews and questionnaires, this study examines the principal causes of increased volumes of construction and demolition waste, as well as the obstacles to both developing and implementing better waste management strategies.

Findings

This study identifies multiple causes of issues related to waste management and barriers to developing and implementing solutions and concludes by recommending a holistic approach to this multifaceted problem. A lack of adequate construction waste management infrastructure, regarding both physical facilities and regulations, was highlighted as the key challenge.

Social implications

The accumulation of waste that results from construction and demolition activity, and activities characterized by unsustainable utilization of raw materials and inefficiency are a global issue. The challenge of effectively managing construction waste is importantly tied to factors including the availability of the necessary infrastructure; economic conditions; and the scarcity of skilled laborers, among others.

Originality/value

This study focuses on the Jordan construction industry, which is so far not very well researched. By building upon previous studies, this study supports further research to illuminate the causes of waste and the barriers to better management, an issue that is not only a pillar of progress at the country level but also key for a sustainable development in general.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 19 December 2022

Emmanuel Chidiebere Eze, Douglas Omoregie Aghimien, Clinton Ohis Aigbavboa and Onyinye Sofolahan

This paper aims to present the result of an assessment of the potential effect of building information modelling (BIM) adoption on the reduction of construction waste (CW) from a…

Abstract

Purpose

This paper aims to present the result of an assessment of the potential effect of building information modelling (BIM) adoption on the reduction of construction waste (CW) from a developing country's perspective. This was done with a view to reducing the waste generated in construction projects particularly at the design and pre-contract stages.

Design/methodology/approach

The study adopted a post-positivism philosophical approach, which informed the use of a quantitative research design and a questionnaire as instrument for data collection. The data gathered from construction professionals in the Nigeria construction industry were analysed using an array of statistical tools such as frequency, percentage, Kruskal–Wallis H-test, Kendall's coefficient of concordance, chi-square and exploratory factors analysis.

Findings

The study revealed five major groups of factors causing CW at the design and pre-contract stages that can be avoided or minimised through BIM implementation. These are; (1) errors in design and documentation, (2) specification and quality factors, (3) estimating and site condition factors, (4) planning of work factors and (5) procurement related factors.

Practical implications

The findings of the study offer practical insight for industry participants on the need for BIM implementation to reduce CW by identifying the diverse areas responsible for these waste generation.

Originality/value

While there has been significant literature on BIM implementation, contributions on the effect of this technology in reducing waste generation particular at the design and pre-contract stages in developing countries has been almost non-existent. This study strives to fill in this gap by showcasing the major waste generating activities that can be avoided through the use of BIM.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 6
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 5 June 2020

Wassim Albalkhy and Rateb Sweis

The purpose of this paper is to identify and theoretically explain the general barriers to adopting lean construction practices in the construction industry regardless of the…

2307

Abstract

Purpose

The purpose of this paper is to identify and theoretically explain the general barriers to adopting lean construction practices in the construction industry regardless of the country or the company size or specialization, and to suggest future research studies in this field.

Design/methodology/approach

Systematic literature review was conducted to identify and explain the list of the barriers from scientific sources that were published before May 2018.

Findings

Twenty-nine barriers were identified and explained, and a proposed model to classify the sources of the barriers was chosen. Seventeen barriers were classified as internal environment-related barriers, five were labor-related, three were materials-related and four were exogenous barriers. In addition, some directions for the future research studies were suggested.

Research limitations/implications

The barriers that are related to the advanced levels of lean construction (LC) implementations, to a specific location or to a specific LC tool were excluded.

Originality/value

This review will help to increase the understanding of the new concept of LC and might help to encourage the adoption of LC practices. Also, it might be useful for identifying the strategies to achieve successful application of these practices.

Details

International Journal of Lean Six Sigma, vol. 12 no. 2
Type: Research Article
ISSN: 2040-4166

Keywords