Article
Publication date: 11 July 2023

Junlong Peng and Qi Zhang

The replenishment of construction materials heavily relies on the functioning of heavy machinery, which often leads to confusion and negotiations among construction work groups…

Abstract

Purpose

The replenishment of construction materials heavily relies on the functioning of heavy machinery, which often leads to confusion and negotiations among construction work groups regarding the allocation rights of these materials. When multiple groups require the same construction materials, they often struggle to determine whether the delivered materials are intended for their own use or if they have encroached upon supplies designated for others. Such uncertainties and negotiations frequently result in delays in construction progress and have the potential to escalate into conflicts. To minimize misunderstandings among work groups and mitigate the risk of severe safety consequences, it is crucial to understand the decision-making processes involved in the interaction between work groups.

Design/methodology/approach

This paper adopts a game theory approach to examine the interactions among work groups from a safety perspective. Quantum response equilibrium (QRE), as a specialized form of game with incomplete information, is assumed to govern the behavior of work groups in this study. By conducting a questionnaire survey, interactive scenarios were simulated. A resource overlap scenario for high-altitude construction is established, with the key factors being the importance of construction materials, the time required to supplement materials, whether managers are present and the climate within the groups. The model parameters were estimated using the expectation–maximization algorithm. Additionally, individual traits and safety awareness are surveyed in the questionnaire, further explaining the results of the game.

Findings

The findings indicate that the likelihood of conflicts between work groups under resource overlap can be quantified. The radical behavior of construction work groups exhibits a positive correlation with the importance of construction materials and the time required for material replenishment. Furthermore, the presence of a safety climate and the oversight of management personnel play a significant role in maintaining the composure of construction work groups. The expanded results of the questionnaire demonstrate that there is considerable room for improvement in workers' safety awareness, and management approaches can be further enhanced to prevent unsafe behaviors from occurring.

Originality/value

A novel game theory model was developed to evaluate the behavior of construction groups in situations of resource overlap. This model offers practical suggestions to improve safety performance and efficiency in construction projects.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 8 November 2022

Junlong Peng and Xiang-Jun Liu

This research is aimed to mainly be applicable to expediting engineering projects, uses the method of inverse optimization and the double-layer nested genetic algorithm combined…

Abstract

Purpose

This research is aimed to mainly be applicable to expediting engineering projects, uses the method of inverse optimization and the double-layer nested genetic algorithm combined with nonlinear programming algorithm, study how to schedule the number of labor in each process at the minimum cost to achieve an extremely short construction period goal.

Design/methodology/approach

The method of inverse optimization is mainly used in this study. In the first phase, establish a positive optimization model, according to the existing labor constraints, aiming at the shortest construction period. In the second phase, under the condition that the expected shortest construction period is known, on the basis of the positive optimization model, the inverse optimization method is used to establish the inverse optimization model aiming at the minimum change of the number of workers, and finally the optimal labor allocation scheme that meets the conditions is obtained. Finally, use algorithm to solve and prove with a case.

Findings

The case study shows that this method can effectively achieve the extremely short duration goal of the engineering project at the minimum cost, and provide the basis for the decision-making of the engineering project.

Originality/value

The contribution of this paper to the existing knowledge is to carry out a preliminary study on the relatively blank field of the current engineering project with a very short construction period, and provide a path for the vast number of engineering projects with strict requirements on the construction period to achieve a very short construction period, and apply the inverse optimization method to the engineering field. Furthermore, a double-nested genetic algorithm and nonlinear programming algorithm are designed. It can effectively solve various optimization problems.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 3
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 15 September 2022

Mohan Wang and Pin-Chao Liao

Hazard warning schemes provide efficient hazard recognition and promote project safety. Nevertheless, these schemes perform poorly because the warning information is calibrated…

Abstract

Purpose

Hazard warning schemes provide efficient hazard recognition and promote project safety. Nevertheless, these schemes perform poorly because the warning information is calibrated for individual characters and is not prioritized for the entire system. This study proposes a hazard warning scheme that prioritizes hazard characters from the inspection process based on the inspectors' experience.

Design/methodology/approach

First, hazard descriptions were decomposed into their characters, forming a double-layer network. Second, warning schemes based on cascading effects were proposed. Third, character-based warning schemes were simulated for various experiences.

Findings

The results show that when a specific hazard is detected, the degree centrality is the most effective parameter for prioritization, and hazard characters should be prioritized based on betweenness centrality for experienced inspectors, whereas degree centrality is preferred for novice inspectors.

Originality/value

The warning scheme theoretically supplements the information-processing theory in construction hazard warnings and provides a practical warning scheme with priority for the development of automated hazard navigation systems.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 1
Type: Research Article
ISSN: 0969-9988

Keywords

1 – 3 of 3