Article
Publication date: 18 December 2023

Ibrahim S. Abotaleb, Yasmin Elhakim, Mohamed El Rifaee, Sahar Bader, Osama Hosny, Ahmed Abodonya, Salma Ibrahim, Mohamed Sherif, Abdelrahman Sorour and Mennatallah Soliman

The objective of this research is to propose an immersive framework that integrates virtual reality (VR) technology with directives international safety training certification…

Abstract

Purpose

The objective of this research is to propose an immersive framework that integrates virtual reality (VR) technology with directives international safety training certification bodies to enhance construction safety training, which eventually leads to safer construction sites.

Design/methodology/approach

The adopted methodology combines expert insights and experimentation to maximize the effectiveness of construction safety training. The first step was identifying key considerations for VR models such as motion sickness prevention and adult learning theories. The second step was developing a game-like VR model for safety training, with multiple hazards and scenarios based on the considerations of the previous step. After that, safety experts evaluated the model and provided valuable feedback on its alignment with international safety training practices. Finally, the developed model is tested by senior students, where the testing format followed the Institution of Occupational Safety and Health (IOSH) working safely exam structure.

Findings

An advanced immersive VR safety training model was developed based on extensive lessons learned from the literature, previous work and psychology-informed adult learning theories. Model testing – through focus groups and hands-on experimentation – demonstrated significant benefit of VR in upgrading and complementing traditional training methods.

Originality/value

The findings presented in this paper make a significant contribution to the field of safety training within the construction industry and the broader context of immersive learning experiences. It also fosters further exploration into immersive learning experiences across educational and professional contexts.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 17 January 2022

Anne Strand Alfredsen Larsen, Anniken Th Karlsen, Jo-Åsmund Lund and Bjørn Sørskot Andersen

The front-end phase plays an important role in achieving project success, and establishment of performance measurement systems considering project challenges or pitfalls is a way…

Abstract

Purpose

The front-end phase plays an important role in achieving project success, and establishment of performance measurement systems considering project challenges or pitfalls is a way of keeping track of this phase. Early warning signs, a type of proactive performance indicators, may serve as means for improving decision-making and project processes aiming for short- and long-term project success. In this paper, the authors present findings from a study on early warning signs (EWS) in hospital projects' front-end. A preliminary systematisation of identified signs as a contribution to front-end improvement is provided.

Design/methodology/approach

The paper is based on a mixed methods approach, using a sequential, exploratory research design comprising document studies, interviews and a survey.

Findings

The authors identified 62 challenges for hospital projects' front-end performance and further established four categories of EWS as follows: (1) structure and tools, (2) context and frame factors, (3) management and (4) relational factors and properties. This mirrors the presence of hard and soft issues from previous studies. There is need for clarifying terminology and raising consciousness on EWS. Processual approaches to identify EWS are considered more useful than subsequent established indicators.

Originality/value

The findings from this paper provide insight into EWS in hospital projects' front-end phase. This adds to the general understanding of EWS and contributes to more knowledge on the front-end phase in general.

Details

International Journal of Managing Projects in Business, vol. 15 no. 2
Type: Research Article
ISSN: 1753-8378

Keywords

Article
Publication date: 7 June 2021

Carol K.H. Hon, Chenjunyan Sun, Bo Xia, Nerina L. Jimmieson, Kïrsten A. Way and Paul Pao-Yen Wu

Bayesian approaches have been widely applied in construction management (CM) research due to their capacity to deal with uncertain and complicated problems. However, to date…

Abstract

Purpose

Bayesian approaches have been widely applied in construction management (CM) research due to their capacity to deal with uncertain and complicated problems. However, to date, there has been no systematic review of applications of Bayesian approaches in existing CM studies. This paper systematically reviews applications of Bayesian approaches in CM research and provides insights into potential benefits of this technique for driving innovation and productivity in the construction industry.

Design/methodology/approach

A total of 148 articles were retrieved for systematic review through two literature selection rounds.

Findings

Bayesian approaches have been widely applied to safety management and risk management. The Bayesian network (BN) was the most frequently employed Bayesian method. Elicitation from expert knowledge and case studies were the primary methods for BN development and validation, respectively. Prediction was the most popular type of reasoning with BNs. Research limitations in existing studies mainly related to not fully realizing the potential of Bayesian approaches in CM functional areas, over-reliance on expert knowledge for BN model development and lacking guides on BN model validation, together with pertinent recommendations for future research.

Originality/value

This systematic review contributes to providing a comprehensive understanding of the application of Bayesian approaches in CM research and highlights implications for future research and practice.

Details

Engineering, Construction and Architectural Management, vol. 29 no. 5
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 29 March 2024

Ibrahim Yahaya Wuni

Sustainable construction re-engineers the conventional project lifecycle to integrate sustainability solutions. The additional sustainability requirements introduce new layers of…

Abstract

Purpose

Sustainable construction re-engineers the conventional project lifecycle to integrate sustainability solutions. The additional sustainability requirements introduce new layers of complexity, challenges and risks that if unaddressed, can derail the gains in sustainable construction projects. This study developed a multidimensional risk assessment model for sustainable construction projects in the United Arab Emirates (UAE).

Design/methodology/approach

The research activities a comprised comprehensive literature review to shortlist relevant risks, an analysis of the probability – impact rating of the shortlisted risks – and the development of a risk assessment model for SC projects in the UAE. The model is developed based on the multicriteria framework and mathematical formulation of the fuzzy synthetic evaluation approach.

Findings

The developed model quantified the overall risk level in sustainable construction projects to be 3.71 on a 5-point Likert scale, indicating that investment in SC projects in the UAE is risky and should be carefully managed. The developed model further revealed that each of the risk groups, comprising management (3.82), technical (3.78), stakeholder (3.68), regulatory (3.66), material (3.53) and economic risks (3.502), presents a significant threat to realizing outcomes typical of SC projects.

Originality/value

This study developed a multidimensional risk assessment model capable of objectively quantifying the overall risk level and provides decision support to project teams to improve risk management in sustainable construction projects.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 8 August 2022

Sitsofe Kwame Yevu, Ann Tit Wan Yu, Amos Darko, Gabriel Nani and David J. Edwards

This study aims to investigate the dynamic influences of clustered barriers that hinder electronic procurement technology (EPT) implementation in construction procurement, using…

Abstract

Purpose

This study aims to investigate the dynamic influences of clustered barriers that hinder electronic procurement technology (EPT) implementation in construction procurement, using the neuro-fuzzy system.

Design/methodology/approach

A comprehensive literature review was conducted and 21 barriers to EPT implementation within construction projects were identified. Based on an expert survey, 121 datasets were gathered for this study. Using mean and normalization analysis for the datasets, 15 out of the 21 barriers were deemed to have critical influences in EPT barriers phenomenon. Subsequently, the critical barriers were classified into five groups: human-related; technological risk-related; government-related; industry growth-related; and financial-related. The relationships and influence patterns between the groups of barriers to EPT implementation were analyzed using the neuro-fuzzy system. Furthermore, sensitivity analysis was performed to examine the dynamic influence levels of the barriers within the hindrance level composition.

Findings

The results reveal that addressing one barrier group does not reduce the high levels of hindrances experienced in EPT implementation. However, addressing at least two barrier groups mostly tends to reduce the hindrance levels for EPT implementation. Further, this study revealed that addressing some barrier group pairings, such as technological risk-related and government-related barriers, while other barrier groups remained at a high level, still resulted in high levels of hindrances to EPT implementation in construction procurement.

Research limitations/implications

This study provides insights for researchers to help them contribute to the development of theory with contemporary approaches based on the influence patterns of barrier interrelationships.

Practical implications

This study provides a model that would help practitioners and decision makers in construction procurement to understand and effectively determine the complex and dynamic influences of barrier groups to EPT uptake, for the development of suitable mitigation strategies.

Originality/value

This study provides novel insights into the complex influence patterns among grouped barriers concerning EPT adoption in the construction industry. Researchers and practitioners are equipped with knowledge on the influence patterns of barriers. This knowledge aids the development of effective strategies that mitigate the combined groups of barriers, and promote the wider implementation of EPT in the construction industry.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 10
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 31 May 2019

Phuoc Luong Le, Thien-My Dao and Amin Chaabane

This paper aims to propose an innovative building information modelling (BIM)-based framework for multi-objective and dynamic temporary construction site layout design (SLD)…

1425

Abstract

Purpose

This paper aims to propose an innovative building information modelling (BIM)-based framework for multi-objective and dynamic temporary construction site layout design (SLD), which uses a hybrid approach of systematic layout planning (SLP) and mathematical modelling.

Design/methodology/approach

The hybrid approach, which follows a step-by-step process for site layout planning, is designed to facilitate both qualitative and quantitative data collection and processing. BIM platform is usedto facilitate the determination of the required quantitative data, while the qualitative data are generated through knowledge-based rules.

Findings

The multi-objective layout model represents two important aspects: layout cost and adjacency score. The result shows that the model meets construction managers’ requirements in not only saving cost but also assuring the preferences of temporary facility relationships. This implies that the integration of SLP and mathematical layout modelling is an appropriate approach to deliver practical multi-objective SLD solutions.

Research limitations/implications

The proposed framework is expected to serve as a solution, for practical application, which takes the advantage of technologies in data collection and processing. Besides, this paper demonstrates, by using numerical experimentation and applying Microsoft Excel Solver for site layout optimisation, how to reduce the complexity in mathematical programming for construction managers.

Originality/value

The original contribution of this paper is the attempt of developing a framework in which all data used for the site layout modelling are collected and processed using a systematic approach, instead of being predetermined, as in many previous studies.

Details

Construction Innovation, vol. 19 no. 3
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 28 May 2021

Zeina Malaeb and Farook R. Hamzeh

In a public-private partnership (PPP), the private sector is represented by a company termed the special purpose vehicle (SPV), which combines different stakeholders including…

Abstract

Purpose

In a public-private partnership (PPP), the private sector is represented by a company termed the special purpose vehicle (SPV), which combines different stakeholders including designers, contractors and service providers under one umbrella. Correct SPV team selection is critical to ensure PPP success as the SPV must act as an integrated entity. In fact, unless the SPV takes an active role in developing trust and promoting integration principles, segmentation of interests, highly adversarial atmospheres, loss of value and economic inefficiency will prevail. Absence of awareness of such principles among stakeholders and the scarcity of literature investigating SPV stakeholder integration create great risks that jeopardize project success. Accordingly, to mitigate the aforementioned risks and provide stakeholders with both the knowledge and the tools to instigate and maintain integration, this paper aims to develop and test a framework to measure SPV stakeholder integration, inspired by the correlation between integrated project delivery (IPD) and SPV operations.

Design/methodology/approach

Following a design science research approach, a structured review is conducted to develop the SPV integration metrics and framework. The framework is then validated through face validation by a panel of industry and academic experts to assess its applicability in measuring SPV integration. Finally, the framework is tested on a well-recognized international PPP project to measure the SPV integration level, and the outcomes are discussed and analyzed.

Findings

The framework was able to assess the integration level of the studied SPV highlighting several areas of low-integration settings and providing guidance for achieving better integration.

Originality/value

This research is the first that develops a model to investigate the SPV’s integration level, from a holistic IPD perspective, to enable successful relationship management and enhance collaboration success. This study inspires practical recommendations for PPP practitioners to reduce the risks of segregated SPVs and their contribution to PPP failure.

Article
Publication date: 9 January 2024

Muneeb Afzal, Johnny Kwok Wai Wong and Alireza Ahmadian Fard Fini

Request for information (RFI) documents play a pivotal role in seeking clarifications in construction projects. However, perceived as inevitable “non-value adding” tasks, they…

Abstract

Purpose

Request for information (RFI) documents play a pivotal role in seeking clarifications in construction projects. However, perceived as inevitable “non-value adding” tasks, they harbour risks like schedule delays and increased project costs, underlining the importance of strategic RFI management in construction projects. Despite this, a lack of literature dissecting RFI processes impedes a full understanding of their intricacies and impacts. This study aims to bridge the gap through a comprehensive literature review, delving into RFI intricacies and implications, while emphasising the necessity for strategic RFI management to prevent project risks.

Design/methodology/approach

This research study systematically reviews RFI-related papers published between 2000 and 2023. Accordingly, the review discusses key themes related to RFI management, yielding best practices for industry stakeholders and highlighting research directions and gaps in the body of knowledge.

Findings

Present RFI management platforms exhibit deficiencies and lack analytics essential for streamlined RFI processing. Complications arise in building information modelling (BIM)-enabled projects due to software disparities and interoperability hurdles. The existing body of knowledge heavily relies on manual content analysis, an impractical approach for the construction industry. The proposed research direction involves automated comprehension of unstructured RFI content using advanced text mining and natural language processing techniques, with the potential to greatly elevate the efficiency of RFI processing.

Originality/value

The study extends the RFI literature by providing novel insights into the problemetisation with the RFI process, offering a holistic understanding and best practices to minimise adverse effects. Additionally, the paper synthesises RFI processes in traditional and BIM-enabled project settings, maps a causal-loop diagram to identify associated issues and summarises approaches for extracting knowledge from the unstructured content of RFIs. The outcomes of this review stand to offer invaluable insights to both industry practitioners and researchers, enabling and promoting the refinement of RFI processes within the construction domain.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 6 April 2021

Bao Ngoc Nguyen, Kerry London and Peng Zhang

This paper aims to report a comprehensive analysis of literature on stakeholder relationships towards identifying patterns of relationships within the off-site construction…

1042

Abstract

Purpose

This paper aims to report a comprehensive analysis of literature on stakeholder relationships towards identifying patterns of relationships within the off-site construction context.

Design/methodology/approach

Key scholarly databases were accessed and after a filtering process, 74 relevant papers were retrieved for analysis. The papers were analysed using qualitative content analysis and scientometric techniques through the application of software Leximancer and VOSviewer.

Findings

Research synthesis methods used in the present study generate compatible results. Through text mining analysis, the key themes identified in the off-site construction stakeholder relationships literature included “collaboration”, “building information modelling”, “social network analysis”, supply chain. As a finding by scientometric analysis, collaboration, BIM, supply chain management, housing and social network analysis were the most frequently entered keywords context of off-site construction. Regarding authorship pattern, the whole network of collaboration was fragmented into multiple isolated clusters, implying that the authors had tendency to cooperate in small groups.

Practical implications

The paper can bring together an important area of research not previously studied in detail. It will primarily assist academics in the first instance; however, the research leads to important findings that will ultimately assist policymakers and practitioners better understand factors affecting stakeholder relationships and in particular network thinking and collaborative mind-sets.

Originality/value

The review contributes a needed systematic and theoretical foundation for future stakeholder relationship studies and practices in off-site construction sector. It provides the basis for future studies and is a seminal analysis of stakeholder management and off-site construction. The scientometric methodology offers scholars a different approach to analysing and visualising literature reviews.

Article
Publication date: 28 February 2019

E.M.A.C. Ekanayake, Geoffrey Shen and Mohan M. Kumaraswamy

The purpose of this paper is to review the state-of-the-art of literature of value management (VM) and to map the VM domain to provide a launch pad for further knowledge…

Abstract

Purpose

The purpose of this paper is to review the state-of-the-art of literature of value management (VM) and to map the VM domain to provide a launch pad for further knowledge development and dissemination.

Design/methodology/approach

This study employed CiteSpace bibliometric analysis software to systematically, comprehensively and accurately review the VM-related literature and to map the VM knowledge domain.

Findings

The results reveal the current VM knowledge base, clusters, research hotspot, and the evolutionary trajectory while contributing to the development of VM knowledge by providing a dynamic platform for integrating future developments in research.

Originality/value

The contribution of this paper to scientific VM knowledge is, therefore, a quantitative and accurate VM knowledge map based on a bibliometric analysis of data from the VM knowledge base, domains and evolution. The findings can be generalised and used as an effective knowledge mapping tool in a specific field of study that could complement and add significant value to the often adopted more traditional literature reviews. This study further recommends that the proposed knowledge map be frequently updated by similar future studies to fill gaps that arise with changing needs, priorities and contexts, as well as to identify corresponding future demands in the VM research domain.

Details

Engineering, Construction and Architectural Management, vol. 26 no. 3
Type: Research Article
ISSN: 0969-9988

Keywords