Search results

1 – 10 of 92
Article
Publication date: 10 August 2023

Lekan Damilola Ojo, Deji Rufus Ogunsemi, Ahmed Elyamany and Ayodeji Emmanuel Oke

The adoption of value management (VM) has been on the rise in the construction industry, especially in the past decade. Identifying the main barriers to VM application for…

Abstract

Purpose

The adoption of value management (VM) has been on the rise in the construction industry, especially in the past decade. Identifying the main barriers to VM application for ameliorating poor project outcomes in the construction industry is a critical step to overcoming its implementation. Therefore, this study aims to examine the barriers to the adoption of VM in the Nigerian construction industry (NCI) and identify the critical ones for action by construction stakeholders.

Design/methodology/approach

This study used two rounds of Delphi surveys with 15 VM experts to identify the challenges to VM adoption. The Delphi team’s data from the two surveys were analysed using descriptive statistics. The mean-mode approach was used to identify ten major barriers to VM adoption based on the consensus reached during the second round of the Delphi poll. Following that, an interrater agreement analysis and a significant level analysis were performed.

Findings

Of the 17 identified barriers hindering VM adoption on construction projects in the NCI, 10 were found to be profound after statistical analyses of the data. The significant barriers include communication gap between the client and other consultants; delay in design preparation because of VM services; the pretext that VM is being practiced in the construction industry; and the wrong perception of VM by construction professionals, among others. The findings of the analysis suggested that the lack of VM adoption in the NCI was because of inadequate knowledge of VM techniques among construction professionals. Therefore, it is advised that VM training be provided for concerned stakeholders to address the lack of VM expertise among Nigerian construction professionals.

Practical implications

This study investigated the barriers to VM adoption on construction projects in the NCI with the opinions of a few construction professionals who can be regarded as VM experts. As against obtaining large survey responses from construction professionals who may not be knowledgeable in the VM process, the limited VM experts’ responses provide a valid basis for drawing inferences and making recommendations to address the paucity of VM applications in the NCI.

Originality/value

Through a Delphi survey, the critical barriers to the adoption of VM were identified, along with recommendations to help construction stakeholders overcome the challenges and enjoy the benefits of VM.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 18 October 2022

Osamudiamen Kenneth Otasowie and Ayodeji Emmanuel Oke

The paper assessed the required drivers of mentoring practices in construction-related firms: a perspective of the quantity surveying (QS) firms in Nigeria with a view to…

Abstract

Purpose

The paper assessed the required drivers of mentoring practices in construction-related firms: a perspective of the quantity surveying (QS) firms in Nigeria with a view to providing possible drivers for effective mentoring relationships in the respective construction firms.

Design/methodology/approach

Survey design was used to assess the level of knowledge, mentoring concept adoption and the required drivers of mentoring relationships in construction-related firms. QS firms in Abuja, Nigeria were sampled through the use of semi-structured questionnaires. A total of 149 questionnaires were administered to principal partners, partners, senior quantity surveyors and quantity surveyors in QS firms in Abuja through personal delivery. A total of 142 of them were returned and found suitable for analysis, representing 95.30% effective response rate. Percentage, mean, Kruskal–Wallis and factor analyses were utilized for the analysis of the data.

Findings

The study revealed an appreciable knowledge of mentoring concept but not so much with the adoption in the respective firms. This connotes that there is a problem with the adoption of mentoring concept in construction-related firms despite knowledge of the concept. Also revealed by the study, are the required drivers of mentoring practices in construction-related firms.

Practical implications

The findings show the required drivers of mentoring practices in construction-related firms and the recommendations to further the adoption and implementation of these drivers to ensure mentoring practices thrive in construction-related firms in the country.

Originality/value

This paper reveals the required drivers of mentoring practices in Nigerian construction-related firms and provides ways through which the drivers can be implemented in the construction firms.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 3
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 26 May 2022

Emmanuel Dele Omopariola, Oludolapo Ibrahim Olanrewaju, Idowu Albert, Ayodeji Emmanuel Oke and Sunday Bankayode Ibiyemi

Sustainable construction practices are strongly correlated with a profitable and competitive construction industry, improved client satisfaction and efficient use of resources…

Abstract

Purpose

Sustainable construction practices are strongly correlated with a profitable and competitive construction industry, improved client satisfaction and efficient use of resources. However, due consideration is not being given to sustainable construction practices in Nigeria. Therefore, this study aims to identify the unsustainable construction practices on construction sites, the barriers to sustainable construction and possible strategies to improve sustainable construction in Nigeria.

Design/methodology/approach

A questionnaire survey of 50 construction sites was conducted with construction professionals on the sites as the specific target, out of which only 43 construction sites have at least a construction professional present at the site. Forty-three filled questionnaires from the respondents were used for descriptive (mean score, standard deviation and charts) and inferential analysis (t-test and Kruskal–Wallis) in this study.

Findings

The study shows that a large percentage (75%) of construction professionals in Nigeria are aware of sustainable construction. The descriptive and inferential analysis showed a disparity in the ranking of the 12 unsustainable practices, 14 barriers and 11 strategies among the respondents. Five unsustainable practices (“negative externalities”, “excess energy”, “unsustainable technologies”, “non-management of health and safety of workers” and “material waste”), six barriers to sustainable construction (“absence of historical data and exemplary projects on which construction professionals can build and learn from”, “lack of professional to handle the task”, “poverty and low urban investment”, “lack of urban and construction policy”, “lack of awareness” and “lack of technical know-how”) and three strategies to improve sustainable construction practices in Nigeria (“cooperation, partnership and participation”, “protection of biodiversity and conservation of natural resources” and “sustainability assessment system”) were found to be significant.

Practical implications

The study offers significant insights into the construction industry unsustainable practices, barriers to sustainable construction, as well as strategies for improving sustainable construction practices. These insights can be applied to other developing countries with an emphasis on geographical differences.

Originality/value

To the best of the authors’ knowledge, this is one of the recent studies in Nigeria that explored the context of sustainable construction in the construction industry by providing insights into the unsustainable construction practices, barriers and strategies to improve sustainable construction in Nigeria.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 14 December 2023

John Aliu, Ayodeji Emmanuel Oke, Timilehin Abayomi, Clinton Aigbavboa and Sina Makanjuola

With a view to ensuring the effective and efficient delivery of construction projects, this study evaluates the critical success factors (CSFs) for the adoption of gamification…

Abstract

Purpose

With a view to ensuring the effective and efficient delivery of construction projects, this study evaluates the critical success factors (CSFs) for the adoption of gamification principles by construction professionals in developing countries, with an emphasis on Nigeria.

Design/methodology/approach

This study adopted a post-positivism philosophical approach, using a questionnaire survey to obtain quantitative data from 126 construction professionals in Lagos State. The data obtained were analyzed using frequencies, percentages, mean item scores (MIS), Kruskal–Wallis H-test and principal component analysis (PCA) as part of the exploratory factor analysis (EFA).

Findings

The findings indicated that the most significant factors for the adoption of gamification principles in the construction industry were “clear game mechanics and rules,” “incentives and rewards for users,” “secure and reliable technology infrastructure,” “real-time progress tracking and feedback” and “clear and measurable objectives.” Employing factor analysis, these CSFs were subsequently grouped into three primary clusters, namely “relevance and user experience,” “technology and support” and “integration and process.”

Practical implications

These findings not only enrich the existing theoretical framework but also provide a solid foundation upon which researchers can build for further theoretical development. This study also offers valuable insights that can inform and improve practical applications of gamification within the construction industry.

Originality/value

While prior research has explored gamification in various contexts, the unique contribution of this study is the thorough investigation of CSFs for gamification adoption specifically within the construction industry. In essence, this study fills a critical gap in the literature by offering fresh perspectives and tailored solutions for the construction industry's specific gamification needs.

Details

Built Environment Project and Asset Management, vol. 14 no. 2
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 22 September 2023

Ayodeji Emmanuel Oke, John Aliu, Patricia Fadamiro, Feyisetan Leo-Olagbaye, Paramjit Singh Jamir Singh and Mohamad Shaharudin Samsurijan

Global construction sector studies have significantly explored the impact of automation techniques, revealing their transformative potential. However, research on their…

Abstract

Purpose

Global construction sector studies have significantly explored the impact of automation techniques, revealing their transformative potential. However, research on their application within specific local contexts, especially in developing countries like Nigeria, is sparse. Nigeria presents a unique context marked by challenges such as skilled labor shortage, safety concerns and cost efficiency. Therefore, investigating the implementation of automation techniques in the Nigerian construction industry is crucial to address these challenges, bring transformative advancements and contribute to a more balanced global discourse on automation adoption. This study aims to fill this significant research gap.

Design/methodology/approach

A mixed research method was deployed which combined both qualitative and quantitative data collection and analysis. Two focus group discussions conducted with 23 experts from both industry and academic institutions (qualitative) yielded 17 drivers which were used to formulate a well-structured questionnaire (quantitative), which was disseminated to construction professionals. Collected data underwent analysis through various statistical techniques, including percentages, frequencies, mean item scores and exploratory factor analysis.

Findings

Principal component analysis (PCA) yielded four driver clusters namely: (1) performance-related drivers, (2) visualization and efficiency-related drivers, (3) technological and human-related drivers and (4) economic-related drivers.

Practical implications

The study provides empirical insights that can aid stakeholders, decision-makers, policymakers and the government in formulating strategies to promote automation techniques in the Nigerian construction industry and beyond.

Originality/value

This study's originality lies in its exploration of the untapped potential of automation techniques in the Nigerian construction industry, offering novel perspectives on how these technologies can address specific challenges such as skilled labor shortage, safety concerns and cost efficiency, thereby paving the way for transformative advancements in the sector.

Details

Built Environment Project and Asset Management, vol. 13 no. 6
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 30 November 2021

Ayodeji Emmanuel Oke, Ahmed Farouk Kineber, Maged Abdel-Tawab, Abdurrahman Salihu Abubakar, Ibraheem Albukhari and Chukwuma Kingsley

The purpose of this paper is to investigate the applicability of cloud computing (CC) and the challenges that contribute to more successful projects with a major sustainable…

Abstract

Purpose

The purpose of this paper is to investigate the applicability of cloud computing (CC) and the challenges that contribute to more successful projects with a major sustainable construction development.

Design/methodology/approach

The previous studies provided information on CC implementation barriers, which were then evaluated by 104 construction stakeholders through a questionnaire survey. As a result, the exploratory factor analysis (EFA) approach was used to investigate these barriers. Furthermore, a partial least square structural equation model was used to build a model of these barriers (PLS-SEM).

Findings

The EFA results revealed that the above-noted factors are in a close relation with three key components, i.e. social, economic and communication. In addition, the proposed model results found the social barrier a key challenge to the implementation of CC.

Research limitations/implications

The results from this study can help decision-makers to improve the approaches regarding data fragmentation that has great effects on the execution of all construction projects. The focus of the paper is to enhance the data fragmentation processes. In addition, the results would be useful to strengthen the sustainability of existing construction projects by enhancing the implementation of CC.

Originality/value

The novelty of this research work will provide a solid foundation for critically assessing and appreciating the different barriers affecting the adoption of CC.

Details

International Journal of Building Pathology and Adaptation, vol. 41 no. 5
Type: Research Article
ISSN: 2398-4708

Keywords

Article
Publication date: 3 April 2018

Ayodeji Emmanuel Oke and Douglas Omoregie Aghimien

The paper aims to determine the possible drivers of value management (VM) in the construction industry with a view of providing better-quality construction and achieving value for…

Abstract

Purpose

The paper aims to determine the possible drivers of value management (VM) in the construction industry with a view of providing better-quality construction and achieving value for money through its usage.

Design/methodology/approach

The study adopts a survey design, and construction professionals from various strata in the six geopolitical zones in Nigeria are assessed using a convenience sample through the use of a structured questionnaire. Frequency, percentage, mean score and one-sample t-test are used for analysing the data gathered.

Findings

Result revealed that although knowledge regarding VM practices is high, its adoption in the industry is average and the involvement of construction professionals in VM workshops is low. Government involvement through the introduction of VM policy, client commitment and proper understanding of VM methodology aid the adoption of VM practices.

Practical implications

This research was conducted across six geopolitical zones of the country as against common practice of selecting a particular region or state to represent the entire country. The findings therefore show a true reflection of the VM drivers in the country. Its recommendations can, to a large extent, increase the use of VM in the country and also other developing countries where construction projects are executed through a similar method, style and approach.

Originality/value

This paper highlights the possible ways of increasing the use of VM in the construction industry with a view to achieve better-quality construction and value for money.

Details

Journal of Engineering, Design and Technology, vol. 16 no. 2
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 14 January 2022

Ayodeji Emmanuel Oke, Ahmed Farouk Kineber, Badr Alsolami and Chukwuma Kingsley

The purpose of this paper is to assess the cloud computing (CC) methods and tools towards the achievement of construction project sustainability in Nigeria.

Abstract

Purpose

The purpose of this paper is to assess the cloud computing (CC) methods and tools towards the achievement of construction project sustainability in Nigeria.

Design/methodology/approach

Data were obtained from the literature, complemented by a quantitative method using a questionnaire distributed among 104 respondents comprising mainly construction professionals in Nigeria. Subsequently, data were analysed using the exploratory factor analysis (EFA) method. In addition, the partial least square structural modelling was used to generate a model for the adoption of CC tools for sustainable construction.

Findings

EFA results indicated that the CC implementation tools could be categorised into four significant constructs: platform, communication, software and data storage. Results obtained from the model showed that platform tools were the most crucial tools for implementing CC in the construction industry.

Practical implications

The findings from this study are essential to the pursuit of perception of methods and tools connected to the vagueness of CC for future employees. In addition, the identified CC tools are expected to enhance the success of construction projects.

Originality/value

The novelty of this research work will be a benchmark or board for decision-makers to quality by adopting CC methods and tools in Nigeria’s construction projects to achieve their sustainable projects.

Article
Publication date: 18 April 2024

John Aliu, Ayodeji Emmanuel Oke, Isaac I. Akinwumi, Rislan Abdulazeez Kanya and Lydia Uyi Ehiosun

This study aimed to investigate and analyze the level of awareness and adoption of distributed ledger technologies (DLTs) within the Nigerian construction industry. The focus was…

Abstract

Purpose

This study aimed to investigate and analyze the level of awareness and adoption of distributed ledger technologies (DLTs) within the Nigerian construction industry. The focus was on addressing the current state of DLT utilization, identifying challenges and opportunities and proposing strategies to enhance the integration of DLTs into the construction processes and practices of Nigerian professionals and organizations.

Design/methodology/approach

The research was underpinned by a robust theoretical and conceptual framework, drawing from established theories of technology adoption. A comprehensive literature review guided the identification of various DLT types. This informed the development of a well-structured questionnaire, which was then distributed to Nigerian construction professionals. The collected data underwent analysis using percentages, frequencies, mean scores, the Kruskal–Wallis H-test and the Shapiro–Wilk test.

Findings

A significant finding of this study reveals a generally low awareness and implementation of DLT among construction professionals in Nigeria. These findings emphasize the urgent need for comprehensive strategies to bridge the gap between awareness and adoption of DLT within the Nigerian construction industry.

Practical implications

Industry associations, regulatory bodies and educational institutions can collaborate to develop specialized programs aimed at familiarizing professionals with the benefits and applications of DLTs. Additionally, technology providers and policymakers can leverage these findings to design user-friendly interfaces and guidelines for seamless DLT integration into construction processes.

Originality/value

This study contributes to the existing body of knowledge by providing a comprehensive assessment of the awareness and adoption of DLTs specifically within the Nigerian construction industry. While the global recognition of DLT’s potential in construction is acknowledged, this research delves into a regional context, shedding light on the specific opportunities within Nigeria. Furthermore, the study’s identification of a gap between awareness and implementation highlights a critical area for future exploration and development in the field of construction technology adoption.

Details

Technological Sustainability, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2754-1312

Keywords

Article
Publication date: 27 November 2023

Ayodeji Emmanuel Oke, John Aliu, Samuel Bankole Oni and Oluwadamilare Olamide Ilesanmi

The purpose of this study is to investigate the obstacles to mechatronics adoption in the construction industry from a Nigerian perspective. It aims to fill the knowledge gap by…

Abstract

Purpose

The purpose of this study is to investigate the obstacles to mechatronics adoption in the construction industry from a Nigerian perspective. It aims to fill the knowledge gap by focusing on the specific challenges faced in developing countries, considering the unique contexts and constraints of the Nigerian construction industry.

Design/methodology/approach

The study used a comprehensive literature review to identify 26 obstacles to mechatronics adoption. These obstacles were used to develop a well-structured questionnaire, which was then distributed to construction professionals using Google Forms through purposive and snowball sampling techniques. The rankings obtained from the questionnaire responses were analyzed to determine the most significant obstacles.

Findings

The study revealed the top five most significant obstacles to mechatronics adoption in the Nigerian construction industry. These obstacles include high costs of operation and maintenance, resistance to adopting new technologies, a lack of standardized protocols, insufficient maintenance capabilities and a lack of government support. Factor analysis revealed five clusters of obstacles: technological-related factors, economic-related factors, capability-related factors, government-related factors and awareness-related factors.

Practical implications

Findings from this study have the potential to inform decision-making, drive policy changes and guide future research efforts aimed at promoting the widespread adoption of mechatronics technologies, ultimately leading to the transformation and improvement of the construction industry as a whole.

Originality/value

This study contributes to the field of mechatronics adoption in the construction industry by addressing the gap in research specific to developing countries such as Nigeria. By identifying and analyzing the obstacles from a Nigerian perspective, the study offers unique insights and original findings.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

1 – 10 of 92