Article
Publication date: 3 October 2016

Riikka Kyrö, Antti Peltokorpi and Karlos Artto

This paper aims to increase understanding on how co-locating in a multi-firm campus setting could be of value to healthcare organizations.

Abstract

Purpose

This paper aims to increase understanding on how co-locating in a multi-firm campus setting could be of value to healthcare organizations.

Design/methodology/approach

The paper presents a qualitative case study of two health campuses in Finland. The data comprises interviews with different organizations operating on the campuses, complemented by onsite observations, and analysis of archival data.

Findings

Based on the empirical analysis, the value of co-locating as perceived by the organizations operating on campus is grouped into four categories: connectivity, cost-efficiency, community and collaboration (or the “four Cs”).

Research limitations/implications

The study does not aim at statistical genaralizability but rather seeks to draw analytical generalizations based on identified empirical regularities. The developed value framework, the four Cs, contributes to current scholarly knowledge on location strategies.

Practical implications

Furthermore, the managerial implications of the four Cs entail a new twofold role for property management: the traditional facilitator role, which is suitable for delivering the two tangible values of connectivity and cost-efficiency, and the modern era integrator, a community builder that is able to deliver community and collaboration.

Originality/value

Previous literature on healthcare facilities has focused on the technical performance of the buildings, while previous literature on the collaborative value of co-location has studied mainly single-firm corporate campuses. This study uniquely explores the potential value of health campuses, where different private, public and third sector organizations co-locate.

Details

Facilities, vol. 34 no. 13/14
Type: Research Article
ISSN: 0263-2772

Keywords

Article
Publication date: 7 February 2017

Karlos Artto, Tuomas Ahola, Riikka Kyrö and Antti Peltokorpi

The purpose of this paper is to increase understanding of the logic of business network formation among the co-located and external actors of a facility.

1309

Abstract

Purpose

The purpose of this paper is to increase understanding of the logic of business network formation among the co-located and external actors of a facility.

Design/methodology/approach

The research adopts a theory-building approach through developing propositions inductively from the empirical case study on four purposefully sampled modern service station facilities. The focus is on analyzing how a facility and its inherent co-located actors represent an entity that forms a business network with external actors in the facility’s environment.

Findings

The findings propose that when co-located with a large number of actors, the facility and its actors represent an entity that is connected to a wide business network of multiple external actors. On the other hand, when co-located with a small number of actors, the facility becomes a part of the overall supply in the surrounding business environment with a differentiated offering for competitive advantage.

Practical implications

The research suggests that an appropriate co-locating strategy, for example, when planning the tenant mix of the facility, can contribute to creating a vivid business network in the external environment, which raises the facility to a role of a central entity in such a network.

Originality/value

The findings explaining how co-location affects the businesses within the facility and within a wider networked environment are novel to the scholarly knowledge on co-location. The research bridges the theories of co-location and business networks that have been treated as separate discourses in previous research.

Details

Facilities, vol. 35 no. 1/2
Type: Research Article
ISSN: 0263-2772

Keywords

Article
Publication date: 14 May 2018

Inka Sankari, Antti Peltokorpi and Suvi Nenonen

Today, academic work includes increasingly informal and collaborative activities. This research attempts to determine whether stakeholders in the development of learning spaces in…

Abstract

Purpose

Today, academic work includes increasingly informal and collaborative activities. This research attempts to determine whether stakeholders in the development of learning spaces in higher education could benefit from the principles of co-working space. This paper aims to determine whether a need exists for co-working space as a learning space solution from the viewpoint of academic space users. This determination will be made by examining the following research question: How does the co-working space concept meet user expectations regarding academic space?

Design/methodology/approach

The research question is answered by investigating users’ experiences of existing learning spaces in higher education in light of future workplace needs. Users’ requirements are examined by analysing user experience survey and interviews. The results are confirmed by focus group interviews and examined in the light of co-working space characteristics that are identified in the literature from the viewpoint of workplace management by searching for similarities between descriptions in the literature and the empirical data.

Findings

This research suggests that academic space users would appreciate it if the spaces they use would reflect some of the co-working space characteristics. These characteristics are community, multipurpose office, high accessibility and attractive workplace. A less applicable co-working space characteristic is space as service.

Research limitations/implications

The results of this study are based on one case, which limits the generalisability of the results.

Practical implications

The results provide suggestions for corporate real estate management and stakeholders in academic institutions to consider when renovating outdated spaces.

Originality/value

The paper expands the literature on learning spaces in higher education and related practices by linking it with co-working spaces, thereby contributing to a field that has not yet been explored in depth.

Details

Journal of Corporate Real Estate, vol. 20 no. 2
Type: Research Article
ISSN: 1463-001X

Keywords

Article
Publication date: 25 January 2019

Riikka Kyrö, Tuuli Jylhä and Antti Peltokorpi

Global megatrends such as urbanization and ageing of the population result in fast-paced demographic changes, which pose different types of challenges for different regions. While…

1429

Abstract

Purpose

Global megatrends such as urbanization and ageing of the population result in fast-paced demographic changes, which pose different types of challenges for different regions. While many rural municipalities bear the burden of under-used buildings, cities are in a hurry to develop new ones to meet new space demands. The purpose of this paper is to assess the potential of relocatable modular buildings to address these challenges, following the principles of circular economy, while at the same time offering usability.

Design/methodology/approach

This multiple case study explores existing relocatable modular health-care buildings in Finland. The case buildings host hospital support functions, imaging services, a health-care centre and a care home. The primary data comprise 21 semi-structured interviews and observation during factory and site visits.

Findings

Based on the findings, relocatable modular buildings have many benefits and provide a viable option for cities and municipalities struggling to meet their fluctuating space demands. Some challenges were also identified, mainly derived from the dimensional restrictions of the modules.

Originality/value

This research contributes to the emerging body of knowledge on circular economy in the built environment. More specifically, the research provides a very concrete example of circularity and details a framework for usable and relocatable modular buildings. In conclusion, relocatable modular buildings could solve the challenges posed by quickly changing demographics in different types of regions and deliver both usability and circularity.

Details

Facilities, vol. 37 no. 1/2
Type: Research Article
ISSN: 0263-2772

Keywords

Open Access
Article
Publication date: 25 March 2024

Roope Nyqvist, Antti Peltokorpi and Olli Seppänen

The objective of this research is to investigate the capabilities of the ChatGPT GPT-4 model, a form of artificial intelligence (AI), in comparison to human experts in the context…

2052

Abstract

Purpose

The objective of this research is to investigate the capabilities of the ChatGPT GPT-4 model, a form of artificial intelligence (AI), in comparison to human experts in the context of construction project risk management.

Design/methodology/approach

Employing a mixed-methods approach, the study draws a qualitative and quantitative comparison between 16 human risk management experts from Finnish construction companies and the ChatGPT AI model utilizing anonymous peer reviews. It focuses primarily on the areas of risk identification, analysis, and control.

Findings

ChatGPT has demonstrated a superior ability to generate comprehensive risk management plans, with its quantitative scores significantly surpassing the human average. Nonetheless, the AI model's strategies are found to lack practicality and specificity, areas where human expertise excels.

Originality/value

This study marks a significant advancement in construction project risk management research by conducting a pioneering blind-review study that assesses the capabilities of the advanced AI model, GPT-4, against those of human experts. Emphasizing the evolution from earlier GPT models, this research not only underscores the innovative application of ChatGPT-4 but also the critical role of anonymized peer evaluations in enhancing the objectivity of findings. It illuminates the synergistic potential of AI and human expertise, advocating for a collaborative model where AI serves as an augmentative tool, thereby optimizing human performance in identifying and managing risks.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 13
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 11 August 2022

Krishna Chauhan, Antti Peltokorpi, Rita Lavikka and Olli Seppänen

Prefabricated products are continually entering the building construction market; yet, the decision to use prefabricated products in a construction project is based mostly on…

2313

Abstract

Purpose

Prefabricated products are continually entering the building construction market; yet, the decision to use prefabricated products in a construction project is based mostly on personal preferences and the evaluation of direct costs. Researchers and practitioners have debated appropriate measurement systems for evaluating the impacts of prefabricated products and for comparing them with conventional on-site construction practices. The more advanced, cost–benefit approach to evaluating prefabricated products often inspires controversy because it may generate inaccurate results when converting non-monetary effects into costs. As prefabrication may affect multiple organisations and product subsystems, the method used to decide on production methods should consider multiple direct and indirect impacts, including nonmonetary ones. Thus, this study aims to develop a multi-criteria method to evaluate both the monetary and non-monetary impacts of prefabrication solutions to facilitate decision-making on whether to use prefabricated products.

Design/methodology/approach

Drawing upon a literature review, this research suggests a multi-criteria method that combines the choosing-by-advantage approach with a cost–benefit analysis. The method was presented for validation in focus group discussions and tested in a case involving a prefabricated bathroom.

Findings

The analysis indicates that the method helps a project’s stakeholders communicate about the relative merits of prefabrication and conventional construction while facilitating the final decision of whether to use prefabrication.

Originality/value

This research contributes a method of evaluating the monetary and non-monetary impacts of prefabricated products. The research underlines the need to evaluate the diverse benefits and sacrifices that stakeholder face when considering production methods in construction.

Article
Publication date: 12 February 2018

An Chen, Paul Martin Lillrank, Henni Tenhunen, Antti Peltokorpi, Paulus Torkki, Seppo Heinonen and Vedran Stefanovic

In healthcare, there is limited knowledge of and experience with patient choice management. The purpose of this paper is to focus on patient choice, apply and test…

Abstract

Purpose

In healthcare, there is limited knowledge of and experience with patient choice management. The purpose of this paper is to focus on patient choice, apply and test demand-supply-based operating (DSO) logic integrated with clinical setting in clarifying choice contexts, investigate patient’s choice-making at different contexts and suggest context-based choice architectures to manage and develop patient choice.

Design/methodology/approach

Prenatal screening and testing in the Helsinki and Uusimaa Hospital District (HUS), Finland, was taken as an example. Choice points were contextualized by using the DSO framework. Women’s reflections, behaviors and experience at different choice contexts were studied by interviewing women participating in prenatal screening and testing. Semi-structured interview data were processed by thematic analysis.

Findings

By applying DSO logic, four choice contexts (prevention, cure, electives and continuous care) were relevant in the prenatal screening and testing episode. Women had different choice-making in prevention and cure mode contexts regarding choice activeness, information needs, social influence, preferences, emotion status and choice-making difficulty. Default choice was widely accepted by women in prevention mode and individual counseling can help women make informed choice in cure mode.

Originality/value

The authors apply the DSO model to contextualize the patient choice in one care episode and compare patient choice-making at different contexts. The authors also suggest the possible context-based choice architectures to manage and promote patient choice

Details

International Journal of Health Care Quality Assurance, vol. 31 no. 1
Type: Research Article
ISSN: 0952-6862

Keywords

Article
Publication date: 10 May 2019

Rita Henriikka Lavikka, Riikka Kyrö, Antti Peltokorpi and Anna Särkilahti

Hospital construction projects often suffer from relatively late changes in the project lifecycle, which disrupt the project execution and impact project productivity. The purpose…

Abstract

Purpose

Hospital construction projects often suffer from relatively late changes in the project lifecycle, which disrupt the project execution and impact project productivity. The purpose of this paper is to explore the root causes of changes in hospital construction projects. The paper aims to propose ways to prepare for the changes.

Design/methodology/approach

The study focuses on changes during the construction of new hospital facilities. An explorative, case study research design is utilised. Five case projects from Finland, Sweden and the USA were selected for in-depth analysis. The primary data comprise semi-structured interviews, supported by secondary evidence such as change order documents.

Findings

The findings reveal eight categories for change sources: contracts, and equipment and systems are reflective of the fast-paced healthcare technology and changing user requirements, while external environment comprises changes caused by both regulatory and physical environment. Changes in operations are reflected in the continuous development of treatment methods and processes. The user, owner, designer and contractor initiated changes represent the stakeholder influence. The paper makes a connection between these change sources and project complexity dimension. A framework for change dynamics is introduced, and product and process flexibility is suggested as a suitable method to prepare for and manage changes.

Originality/value

The paper is the first to link construction changes to project complexity factors. The paper argues that changes, when managed appropriately, are not only necessary but also beneficial to large construction projects in a quickly changing environment. The findings guide project stakeholders in implementing project flexibility, in the product and process dimensions, which is a balancing force to project complexity.

Details

Engineering, Construction and Architectural Management, vol. 26 no. 9
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 29 March 2021

Rita Lavikka, Krishna Chauhan, Antti Peltokorpi and Olli Seppänen

Systemic innovations emerge and create value in an inter-organisational context. However, innovation studies rarely investigate the role of value creation and value capture among…

2365

Abstract

Purpose

Systemic innovations emerge and create value in an inter-organisational context. However, innovation studies rarely investigate the role of value creation and value capture among multiple organisations in successful innovation implementation. This paper aims to understand the role of value creation and value capture in the implementation of systemic innovations in construction which is by nature, an inter-organisational context.

Design/methodology/approach

The empirical research focused on the barriers, enablers and opportunities for value creation and value capture of the Finnish construction project parties when trying to implement mechanical, electrical and plumbing (MEP) prefabrication, which is a systemic innovation. Data were collected through interviews, observations and action workshops.

Findings

The empirical study identified interaction patterns on how social, political, technical and economic barriers lead to uneven value capturing, lack of value-based procurement and unclear value creation between MEP design and installation. They hinder the implementation of MEP prefabrication. The results point to enablers leading to fairly shared value to all parties, procurement of value and collaborative value creation, thus increasing the usage of MEP prefabrication, a systemic innovation.

Originality/value

The study adds new knowledge by demonstrating that the identification of barriers and their interaction with enablers and opportunities for value creation and capture lay a baseline for suggestions on how to implement a systemic innovation. This study stresses the importance of enabling value creation and capture for all construction project parties when implementing a systemic innovation.

Details

Construction Innovation , vol. 21 no. 4
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 2 April 2019

Riikka Kyrö, Antti Peltokorpi and Lauri Luoma-Halkola

The fast advancement of medical technology and processes poses challenges to hospital construction and management. The purpose of this paper is to provide a structured approach to…

Abstract

Purpose

The fast advancement of medical technology and processes poses challenges to hospital construction and management. The purpose of this paper is to provide a structured approach to advancing adaptability in hospital retrofits, proposing the preferable timing and scope of different adaptability strategies.

Design/methodology/approach

A qualitative research approach was chosen, with 28 semi-structured interviews designers, project managers, clients and healthcare professionals as the primary research data.

Findings

This paper presents a model for planning for the future in hospital retrofits. The model includes 11 different adaptability strategies, categorized based on the level of adaptability. Furthermore, each strategy is linked to an open building system level, indicating the appropriate timing. Based on the findings, generality strategies in the tertiary building system level are the most effective forms of adaptability, as they are easy to implement and answer to non-specific changes in hospital operations.

Research limitations/implications

The findings contribute to existing knowledge on adaptability in buildings, and provide practical guidance particularly for designers. A new type of service offering, an adaptability roadmap detailing the scope and timing of adaptability, is suggested.

Originality/value

The paper contributes to the existing research by detailing different approaches and knowledge related to adaptability and its strategies in hospital retrofits. More specifically, the three-fold categorization of adaptability is linked to both timing and intrusiveness in a novel way.

Details

Engineering, Construction and Architectural Management, vol. 26 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

1 – 10 of 25