Search results

1 – 10 of over 17000
Article
Publication date: 27 July 2023

Ning Huang, Qiang Du, Libiao Bai and Qian Chen

In recent decades, infrastructure has continued to develop as an important basis for social development and people's lives. Resource management of these large-scale projects has…

Abstract

Purpose

In recent decades, infrastructure has continued to develop as an important basis for social development and people's lives. Resource management of these large-scale projects has been immensely concerned because dozens of construction enterprises (CEs) often work together. In this situation, resource collaboration among enterprises has become a key measure to ensure project implementation. Thus, this study aims to propose a systematic multi-agent resource collaborative decision-making optimization model for large projects from a matching perspective.

Design/methodology/approach

The main contribution of this work was an advancement of the current research by: (1) generalizing the resource matching decision-making problem and quantifying the relationship between CEs. (2) Based on the matching domain, the resource input costs and benefits of each enterprise in the associated group were comprehensively analyzed to build the mathematical model, which also incorporated prospect theory to map more realistic decisions. (3) According to the influencing factors of resource decision-making, such as cost, benefit and attitude of decision-makers, determined the optimal resource input in different situations.

Findings

Numerical experiments were used to verify the effectiveness of the multi-agent resource matching decision (MARMD) method in this study. The results indicated that this model could provide guidance for optimal decision-making for each participating enterprise in the resource association group under different situations. And the results showed the psychological preference of decision-makers has an important influence on decision performance.

Research limitations/implications

While the MARMD method has been proposed in this research, MARMD still has many limitations. A more detailed matching relationship between different resource types in CEs is still not fully analyzed, and relevant studies about more accurate parameters of decision-makers’ psychological preferences should be conducted in this area in the future.

Practical implications

Compared with traditional projects, large-scale engineering construction has the characteristics of huge resource consumption and more participants. While decision-makers can determine the matching relationship between related enterprises, this is ambiguous and the wider range will vary with more participants or complex environment. The MARMD method provided in this paper is an effective methodological tool with clearer decision-making positioning and stronger actual operability, which could provide references for large-scale project resource management.

Social implications

Large-scale engineering is complex infrastructure projects that ensure national security, increase economic development, improve people's lives and promote social progress. During the implementation of large-scale projects, CEs realize value-added through resource exchange and integration. Studying the optimal collaborative decision of multi-agent resources from a matching perspective can realize the improvement of resource transformation efficiency and promote the development of large-scale engineering projects.

Originality/value

The current research on engineering resources decision-making lacks a matching relationship, which leads to unclear decision objectives, ambiguous decision processes and poor operability decision methods. To solve these issues, a novel approach was proposed to reveal the decision mechanism of multi-agent resource optimization in large-scale projects. This paper could bring inspiration to the research of large-scale project resource management.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 28 March 2024

Ewa Sońta-Drączkowska and Agnieszka Krogulec

This study seeks to illuminate the managerial tensions inherent in implementing scaled agile (on the organizational, top management, middle management and team levels) and to…

Abstract

Purpose

This study seeks to illuminate the managerial tensions inherent in implementing scaled agile (on the organizational, top management, middle management and team levels) and to frame these challenges within the broader context of project management.

Design/methodology/approach

The study adopts a grounded theory approach and delves into a qualitative dataset sourced from 34 interviews with subject matter experts actively engaged in scaling agile initiatives within large organizations spanning various industries. Additionally, the data have been enriched through a comprehensive literature review of the existing body of knowledge on scaling agile.

Findings

As a result of our investigation, we propose a framework of managerial tensions in scaling agile in large corporate settings and a series of research propositions and questions that may contribute significantly to the body of knowledge surrounding the phenomenon of “deprojectification” and propose agenda for the future studies in the field of project management.

Research limitations/implications

The study also carries significant managerial implications. Firstly, based on the insights from the practice of scaling agile in large corporate setting, management can build awareness of the challenges inherent of transitioning to agile practices. This may help to anticipate the possible problems and proactively develop strategies how to address them. Secondly, management can be instructed about contingencies inherent in scaling agile, along with the potential disfunctions and side effects (unintended outcomes) that may emerge during the transition process. Thirdly, project management practitioners can gain insights on how scaling agile may cause shifts in the approach to managing projects, project team management and competencies that need to be developed to cope with environments where various approaches to managing projects coexist.

Practical implications

These insights can aid in the agile transition process, beginning with directing managerial attention toward contextual factors and progressing through potential challenges at the organizational, top management, middle management and team levels. Furthermore, the study highlights possible dysfunctionalities and side effects of scaling agile, shedding light on the “dark side” of agile.

Originality/value

The study contributes to the expansion of the empirical database on the implementation of agile practices in large organizational settings. It plays a role in defining and delineating the phenomenon of scaling agile within the context of project management and outlines a research agenda for future project management studies. Additionally, our study adds to the ongoing discourse surrounding the “deprojectification” effect that can occur during the scaling of agile. Lastly, it establishes connections between project management and software development literature regarding the implementation of agile at scale.

Details

International Journal of Managing Projects in Business, vol. 17 no. 2
Type: Research Article
ISSN: 1753-8378

Keywords

Article
Publication date: 3 May 2024

Maria Cleofe Giorgino and Federico Barnabè

Drawing motivation from the greater exposure to uncertainty and condition changes that affect large projects due to their long lifecycle, this paper aims to investigate how the…

Abstract

Purpose

Drawing motivation from the greater exposure to uncertainty and condition changes that affect large projects due to their long lifecycle, this paper aims to investigate how the time factor affects the use of governance mechanisms to pursue the success of these projects.

Design/methodology/approach

To pursue its aim, the article applies the dichotomization between the hard and soft mechanisms of project governance to the analysis of a historical case study, whose findings are organized over the short, medium and long periods. The case selected is referred to the peculiar water system, made up of tunnels named “bottini,” that was in use in Siena (Italy) as the old aqueduct. Specifically, the study focuses on the project of expansion of this water system that was realized during the 14th century for the construction of the “Bottino maestro di Fontegaia.”

Findings

This article highlights the different relevance that, during the lifecycle of large projects, is assumed by hard and soft governance mechanisms, with the former having main relevance in a short and medium period, and the latter usually emerging in the medium period and, subsequently, playing a growing role for the project success in the long period.

Originality/value

The article contributes to the literature on large projects by providing novel insights about how the time factor impacts the governance of these projects. Furthermore, the case study, with its unique history, highlights the relevance of combining effectively the hard and the soft dimensions of project governance to pursue success.

Details

Journal of Management History, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1751-1348

Keywords

Article
Publication date: 23 August 2022

Yixi Zhang, Bee Lan Oo and Benson Teck-Heng Lim

Contractors of different scales, operating in different construction industries of varying institutional and economic settings, have different considerations when making bid or…

Abstract

Purpose

Contractors of different scales, operating in different construction industries of varying institutional and economic settings, have different considerations when making bid or no-bid and mark-up decisions. Focusing on the large and medium-sized contractors in the Jilin province, China, the purpose of this study is to examine important factors affecting their decision to bid (d2b) and mark-up decisions and investigate differences between large and medium-sized contractors in evaluating the importance of the various factors affecting their d2b and mark-up decisions.

Design/methodology/approach

This study used a survey design for timely data collection from a large population. Contractors’ bidding attitudes was collected using an online survey questionnaire with a list of 40 key factors. Statistical analytical methods were applied for comparing the two groups of contractors.

Findings

The results of this study indicate that factors related to client conditions are most critical for both large and medium-sized contractors in their d2b and mark-up decisions. The results also show statistically significant differences between the two groups of contractors on a subset of factors affecting their d2b and mark-up decisions. The large contractors have placed more emphasis on projects' potential financial and strategic benefits. Another notable finding is that both groups of contractors have placed great emphasise on “government legislations” in their d2b and mark-up decisions.

Research limitations/implications

These findings should be interpreted in consideration of several limitations. Firstly, the sample size is relatively small, and the focus was on a single province in the China construction industry. Next, this study only explores differences between large and medium-sized contractors in evaluating the importance of the various factors affecting their d2b and mark-up decisions.

Practical implications

Contractors could refer list of critical factors in competing for jobs in Jilin province or other provinces of similar institutional and economic settings. Construction clients, on the other hand, should consider the list of critical factors in the formulation of their competitive tendering procedures, thus enhancing the efficiency in their procurement of construction services.

Originality/value

Research on contractors’ bidding decision-making in the context of Chinese construction industry remains scarce; the research findings have implications for the industry stakeholders.

Details

Construction Innovation , vol. 23 no. 5
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 20 May 2024

Helene Berg and Ole Henning Nyhus

Value creation for society from public projects requires that the overall benefits exceed the use of taxpayers' money. At the same time, cost overruns in public projects are a…

Abstract

Purpose

Value creation for society from public projects requires that the overall benefits exceed the use of taxpayers' money. At the same time, cost overruns in public projects are a well-documented feature in the literature, but practical guidance on reducing the extent and magnitude of overruns is rare. In 2000, Norway introduced a governance regime that includes mandatory external quality assurance (QA) of cost estimates for major public projects. This paper compares the cost performance of public projects on each side of this QA scheme.

Design/methodology/approach

We use an original dataset covering 1,704 projects from 2000 to 2021, reported first-hand from Norwegian public agencies. We apply quantitative methods in the form of descriptive statistics, regression models, and statistical testing of hypotheses to answer our research questions.

Findings

The mean cost overrun across projects in our dataset is smaller than several previous international studies have reported. We find no statistical support for different cost performances between QA and non-QA projects. Secondly, cost overruns seem to vary between different public sectors. A third finding is a small development with lower cost overruns over time for the non-QA projects, and we raise the question of whether the QA scheme has contributed to overall learning effects. The fourth finding is that cost deviations are quite independent of project size.

Originality/value

The paper offers novel insights for decision-makers and researchers on the effects of external quality assurance on cost performance in public projects.

Details

International Journal of Managing Projects in Business, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1753-8378

Keywords

Book part
Publication date: 16 May 2024

Guus Hendriks

China’s foreign aid efforts in Africa remain contentious. Chinese foreign aid tends to be different from “traditional” development assistance in that it frequently involves firms…

Abstract

China’s foreign aid efforts in Africa remain contentious. Chinese foreign aid tends to be different from “traditional” development assistance in that it frequently involves firms as the implementing agents of projects. Firms bring unique resources to public–private partnerships (PPPs) formed with government agencies, but their possible self-interested nature also gives rise to concerns over their development impact. Yet, on a larger scale, little is known about the characteristics of Chinese PPPs in foreign aid. Using project-level data available for 1,308 Chinese aid projects in 50 countries across Africa, the author characterizes the projects undertaken by firms and government agencies in a PPP and contrasts them to those executed by Chinese government agencies without firm involvement. This exploratory data analysis suggests that important differences apply, as Chinese PPPs tend to target different sustainable development goals (SDGs), work on the basis of distinct aid conditions, and implement projects that tend to be larger than those that are solely run by government agencies. Such observations raise important questions of an ethical, theoretical, and international nature, and warrant further research. The author develops a research agenda that aims at issues particularly important for business ethics scholars, organization theorists, and international business scholarship.

Details

Walking the Talk? MNEs Transitioning Towards a Sustainable World
Type: Book
ISBN: 978-1-83549-117-1

Keywords

Article
Publication date: 15 January 2024

Kristina Areskoug Josefsson and Gerd Hilde Lunde

Sexual health is insufficiently addressed in health care and higher education, which can lead to lower quality of life and negative health outcomes. To improve the situation, it…

Abstract

Purpose

Sexual health is insufficiently addressed in health care and higher education, which can lead to lower quality of life and negative health outcomes. To improve the situation, it is necessary to address both the needs of patients and professionals and collaboratively engage in finding sustainable solutions. The purpose of this paper is to explore the feasibility and value of large-scale digital coproduction in higher education.

Design/methodology/approach

A study of a project that developed seven interprofessional, digital master-level courses covering different topics related to sexual health. The project was performed through digital coproduction in higher education, with over 100 persons with various backgrounds working together online in designing content and novel digital learning activities.

Findings

Large-scale digital coproduction in higher education is feasible and valuable, but the process demands sensitive leadership, understanding of coproduction processes and willingness to learn from each other. To meet the demands from practice it is important to understand the complexity, ever-changing and unpredictable working life changes which, in turn, demands engagement in continuous learning, training activities and the need for formal education.

Originality/value

The study provides learning of the feasibility of the value of large-scale digital coproduction in higher education, which is a novel way of working in higher education.

Details

The Learning Organization, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-6474

Keywords

Article
Publication date: 24 May 2024

Ali Mohammad Mirzaee and Igor Martek

Optimal clean-up procedures lie at the heart of the closeout phase of construction projects under contract law. However, due to its complexity involving multiple issues…

Abstract

Purpose

Optimal clean-up procedures lie at the heart of the closeout phase of construction projects under contract law. However, due to its complexity involving multiple issues, potentially unfulfilled contractual obligations, performance claims and counter-claims, combined with consequently deteriorating stakeholder relationships, the management of closeouts is fraught with difficulties leading to suboptimal outcomes. This is particularly true where general contractor (GC) organizations do not have a claims management office (CMO) dedicated to improving such suboptimal clean-up outcomes. Thus, this study aims to develop a model by which CMOs’ may effectively manage the clean-up phase in an environment of closeout claims.

Design/methodology/approach

X-inefficiency theory was utilized as the theoretical lens guiding this study. The theory helps identify closeout strategies implemented by a GC, which manages completion claims through a CMO. Data were received and analyzed from a large GC, which served as the firm case study. In this case, managing the closeout completion claims was the main function of the CMO.

Findings

The average delay of closeout completion was four times greater than construction phase delays. The GC results highlighted the “economic destruction tsunami of projects,” as a root cause for these completion delays. Wrap-up activities under contract law are identified, including within the domains of statements of completion, project handover and debt settlement. Behavior strategies are also defined, including relational and contractual approaches. Moreover, a process for improving closeout claim performance is described, comprising project closeout identification, rational intra-firm behavior, closeout completion and program closeout practice.

Originality/value

Findings from this work can significantly contribute in X-inefficiency theory in relation to how a decrease of X-inefficiency will lead to better closeout claim performance. It also offers practical insights into how best to minimize delayed closeout completion while providing valuable lessons for stakeholders in complex infrastructure projects. Further, a model is developed that may be utilized by owners, consultancies, designers and other contractor organizations in an effort to improve closeout claim performance.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 23 April 2024

Anna Kadefors, Kirsi Aaltonen, Stefan Christoffer Gottlieb, Ole Jonny Klakegg, Pertti Lahdenperä, Nils O.E. Olsson, Lilly Rosander and Christian Thuesen

Relational contracting is increasingly being applied to complex and uncertain construction projects. However, it has proved hard to achieve stable performance and industry-level…

Abstract

Purpose

Relational contracting is increasingly being applied to complex and uncertain construction projects. However, it has proved hard to achieve stable performance and industry-level learning in this field. This paper employs an institutional perspective to analyze how legitimacy for relational contracting has been produced and challenged in Denmark, Finland, Norway and Sweden, including implications for dissemination and learning.

Design/methodology/approach

A collaborative case study design is used, where longitudinal accounts of the developments in relational contracting over more than 25 years in four Nordic countries were developed by scholars based in each country. The descriptions are underpinned by literature sources from research, practice and policy.

Findings

The countries share similar problem perceptions that have triggered the de-institutionalization of traditional contracting practices. Models and policies developed elsewhere are important sources of knowledge and legitimacy. Most countries have seen pendulum movements, where dissemination of relational contracting is followed by backlashes when projects fail to meet projected outcomes. Before long, however, relational contracting tends to re-emerge under new labels and in slightly new forms. Such a proliferation of concepts presents further obstacles to learning. Successful institutionalization is found to rely on realistic goals in combination with broad competence development at the organizational and industry levels.

Practical implications

In seeking inspiration from other countries, policymakers should go beyond contract models to also consider strategies to manage industry-level learning.

Originality/value

The paper provides a unique longitudinal cross-country perspective on the field of relational contracting. As such, it contributes to the small stream of literature on long-term institutional change in the construction sector.

Details

International Journal of Managing Projects in Business, vol. 17 no. 8
Type: Research Article
ISSN: 1753-8378

Keywords

Article
Publication date: 29 October 2021

Abdullahi Babatunde Saka and Daniel W.M. Chan

Building information modelling (BIM) research studies are highly contextual as the contexts provide lenses for interpreting the results. However, there has been a growing…

Abstract

Purpose

Building information modelling (BIM) research studies are highly contextual as the contexts provide lenses for interpreting the results. However, there has been a growing decontextualization in extant studies especially between the small and medium-sized enterprises (SMEs) and large firms; and between developed and developing countries. Albeit these contexts are all in the same construction industry, they often react differently to the same conditions. Thus, this study aims to evaluate the perceptions of firms in varying contexts of size and location on the perceived barriers to the implementation of BIM in the architecture, engineering and construction (AEC) industry.

Design/methodology/approach

The perceptions of 228 firms gleaned from 26 countries across the 6 continents were collated via an international empirical questionnaire survey. The data was analysed using the mean score, rank agreement analysis, Mann-Whitney U test and factor analysis.

Findings

The findings revealed the major factors impending BIM implementation in each of the contexts and a comparative analysis emphasized the difference in their perceptions. The findings underscore that there is a general digital divide as regard BIM implementation between the SMEs and large firms, and a deepening divide between the developed and developing countries.

Originality/value

The study has provided empirical evidence for the BIM divide in the AEC industry, which would influence the promulgation of BIM policy and transferability of best practices across varying contexts of both firm size and country level.

Details

Journal of Engineering, Design and Technology , vol. 21 no. 5
Type: Research Article
ISSN: 1726-0531

Keywords

1 – 10 of over 17000