Search results

1 – 10 of over 2000
Article
Publication date: 15 June 2023

Ahmed Nouh, Elsayed Elkasaby and Omnia Wageh

Innovative design and execution approaches are employed in infrastructure sectors and planning to enhance the integrated project delivery system, assure the sustainability of…

Abstract

Purpose

Innovative design and execution approaches are employed in infrastructure sectors and planning to enhance the integrated project delivery system, assure the sustainability of infrastructure projects, and meet the demands of the dynamic, changing environment. Delivery methods must incorporate new technologies. By combining digital technology, teamwork, and mass manufacturing, a greater degree of exceptional quality, sustainability, and resilience in the environment will be generated. As a result, a new approach does not rely on the reaction policy, but instead considers alternative scenarios and employs a simulation model to determine the best course of action.

Design/methodology/approach

In the paper, the system dynamics approach to construction management is validated in light of pertinent research. Additionally, it describes the difficulties facing the infrastructure projects' delivery system. Additionally, the strategy for system dynamics creation is described. This strategy includes a causal loop diagram, generates a stock-flow diagram, and simulates forecasts of model behavior over time. Next, the optimization model's validation process is used to create a system dynamics model for choosing the best infrastructure project delivery system project and controlling it to maximize sustainability, mass production, digital integration, and team integration. The dynamic complexity of project management is growing.

Findings

The primary goal is to present a system dynamics (SD) simulation to look at how well infrastructure projects perform in terms of choosing the best method for delivering infrastructure projects. One of the most ideal methods for delivering projects is integrated project delivery. An effective methodology for making strategic decisions on the choice of the best project delivery method. In order to enhance certain infrastructure project delivery system metrics for sustainability, mass production, digital integration, and team integration, the model included building strategy and sophisticated system dynamics simulation. According to the construction strategy, the outcomes have been satisfactory.

Originality/value

System dynamics research has been done to replicate the idea of contemporary construction in order to determine the best approach for delivering infrastructure. The government and decision-makers would benefit from understanding this research as they decide on the best delivery method for boosting the sustainability and productivity of infrastructure projects in Egypt.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 17 May 2024

Sina Moradi, Janne Hirvonen and Piia Sormunen

The energy performance gap (EPG) in building construction has been one of the major barriers to the realization of environmental and economic sustainability in the built…

Abstract

Purpose

The energy performance gap (EPG) in building construction has been one of the major barriers to the realization of environmental and economic sustainability in the built environment. Although there have been a few studies addressing this issue, studying this topic with a special focus on the project delivery process has been almost overlooked. Hence, this study aims to address the EPG in building construction through the lens of collaborative and life cycle-based project delivery.

Design/methodology/approach

In order to realize the objective of this study, the development of a theoretical framework based on the literature review was followed by a qualitative study in which 21 semi-structured interviews were conducted with Finnish project professionals representing clients, design/planning experts, constructors and building operation/maintenance experts to explore their views on the topic under study.

Findings

The findings reveal the project delivery-related causes of EPG in building construction. Moreover, the obtained results present a collaborative and life cycle-based delivery model that integrates project and product (i.e. building) life cycles, and it is compatible with all types of contractual frameworks in building construction projects.

Research limitations/implications

Although the findings of this study significantly contribute to theory and practice in the field of collaborative and sustainable construction project delivery, it is acknowledged that these findings are based on Finnish professionals’ input, and expanding this research to other regions is a potential area for further studies. Moreover, the developed model, although validated in Finland, needs to be tested in a broader context as well to gain wider generalizability.

Originality/value

The obtained results reveal the significance and impact of collaborative and life cycle-based project development and delivery on the realization of environmentally sustainable building construction.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 10 November 2023

Bamidele Temitope Arijeloye

This paper aims to help understand how adopting risk allocation criteria impacts the delivery of public–private partnership (PPP) mass housing in Nigeria with the view of…

Abstract

Purpose

This paper aims to help understand how adopting risk allocation criteria impacts the delivery of public–private partnership (PPP) mass housing in Nigeria with the view of promoting the adoption of PPP housing scheme in Nigeria.

Design/methodology/approach

The research design adopts the census sampling approach by using well-structured questionnaires distributed to stakeholders involved in PPP-procured mass housing projects, i.e. consultants, in-house professionals, contractors and the organized private sector, registered with PPP departments in the Federal Capital Territory Development Authority, Abuja, Nigeria. Sixty-three risk factors, nine risk allocation criteria and nine project delivery indices were submitted for the respondents to rank on a Likert scale of 7. Two hypotheses were formulated to test whether the risk allocation criteria impacted PPP mass housing delivery or otherwise. The study adopts partial least square-structural equation modeling to model the effect of risk on risk allocation criteria on project delivery indices and risk severity.

Findings

The finding shows that project risk allocation criteria have less effect on project delivery indices than on risk severity. The study concludes that risk allocation principles do not directly affect the delivery of PPP-procured mass housing projects. This is evident by the path coefficient of 0.724 values, which is not statistically significant at a 5% alpha protection value. The study concludes that allocating critical risk factors influences the performance of PPP-procured mass housing projects, as the path coefficient of 0.360 is also not significantly far from 0 and at a 5% alpha protection value.

Originality/value

The study is one of the recent studies conducted in PPP-procured mass housing projects in Nigeria owing to the novelty of procurement option in the sector. It highlights the risk factors that can jeopardize the PPP-procured mass housing project objectives. The study is of immense value to PPP actors in the sector by providing the necessary information required to formulate risk response methods to minimize the impact of the risk factors in PPP mass housing projects.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 20 February 2023

Eyad Aboseif and Awad S. Hanna

The exact process of construction projects performance assessment and benchmarking still remains subjective relying on qualitative techniques, which does not allow stakeholders to…

Abstract

Purpose

The exact process of construction projects performance assessment and benchmarking still remains subjective relying on qualitative techniques, which does not allow stakeholders to address the issues and the drawbacks of their respective projects as effectively as possible for performance improvement purposes. Hence, this research aims to establish a unified project performance score (PPS) for assessing and comparing projects performance.

Design/methodology/approach

Data were collected from Construction Industry Institute (CII) members and through University of Wisconsin active research projects. Exploratory data analysis was done to investigate the calculated performance metrics and the collected data characteristics. Data were converted into six performance metrics which were used as the independent variables in creating the PPS model. Logistic regression model was developed to generate the unified PPS equation in order to explain the variables that significantly affect construction projects successful post-completion performance. The PPS model was then applied on the collected dataset to benchmark projects in terms of project delivery systems, compensation types and project types in order to showcase the PPS capabilities and possible applications.

Findings

The model revealed that construction cost and schedule growth are the most important metrics in assessing projects performance, while RFIs’ processing time and change orders per million dollars were the features with the least effect on the PPS value. The authors found that integrated project delivery (IPD) and target value (TV) projects outperformed all other project delivery and compensation types. While, industrial projects showed the worst performance, as compared to commercial or institutional projects.

Originality/value

The PPS model can be used to assess the performance of any pool of executed projects, and introducing a novel addition to the field of construction business analytics which is a supplementary tool to successful decision making and performance improvement. Additionally, the bidding selection system can be revolutionized from a cost-based to a performance based one using the PPS model to improve the outcomes of the buyout process.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 14 September 2023

Peter Dodzi Kwasi Agbaxode, Ehsan Saghatforoush and Sitsabo Dlamini

The conventional project delivery (CPD) approach has been reported in the literature as the most widely used project delivery method in the construction industry globally compared…

Abstract

Purpose

The conventional project delivery (CPD) approach has been reported in the literature as the most widely used project delivery method in the construction industry globally compared to other delivery methods. However, researchers and practitioners have argued that the approach, specifically during the production of design documentation under the CPD, lacks certain capabilities that ensure quality and enhance project delivery. Therefore, this study aims to use the Ghanaian construction industry to identify the capabilities required of the CPD in practice, particularly during the production of design documentation.

Design/methodology/approach

The study design follows a pragmatist philosophy and uses mixed methods based on a deductive approach. Data collection involved a questionnaire survey, followed by semi-structured interviews. Quantitative data analysis used descriptive and inferential statistics, whereas qualitative data analysis used content analysis with the assistance of IBM SPSS and QSR Nvivo 12 Pro.

Findings

Findings indicate that there should be incentives for producing good design documentation quality; mandatory coordination of design documentation; improving collaboration among designers; and allowing contractors to make input during the design stage.

Practical implications

The results indicate the need for the identified capabilities to be introduced in the CPD approach to improve design documentation quality.

Originality/value

This study offers a significant insight into the specific capabilities that are required of the CPD approach in practice particularly, in the production of design documentation

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 2 May 2023

Michael Adesi, Duga Ewuga, De-Graft Owusu-Manu, Frank Boateng and Ernest Kissi

Firms in the architectural, engineering, construction and operations (AECO) sector continue undertaking projects in a disruptive environment due to the coronavirus disease 2019…

Abstract

Purpose

Firms in the architectural, engineering, construction and operations (AECO) sector continue undertaking projects in a disruptive environment due to the coronavirus disease 2019 (COVID-19) pandemic. This study aims to explore environmental turbulence in the AECO project delivery space and suggest mechanisms for enhancing resilience against future pandemics.

Design/methodology/approach

The study adopts the quantitative approach by administering 110 survey questionnaires to participants comprising project managers, site engineers, quantity surveyors, contractors and subcontractors.

Findings

The study identifies 24 COVID-19 disruptions linked to environmental turbulence categorised as scheduling, performance and productivity, project budget, supply chain, resource allocation and technological and regulatory. The study suggested resilient mechanisms for surviving in future pandemics.

Originality/value

This study enhances the understanding of environmental turbulence from the perspective of COVID-19 disruptions in AECO project delivery, while the implementation of the resilient mechanisms improves capability of AECO firms against future pandemics.

Details

International Journal of Building Pathology and Adaptation, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2398-4708

Keywords

Article
Publication date: 19 December 2022

Dinçer Aydın and Esma Mıhlayanlar

Many parameters influence the success of sustainable projects (SPs) in the architecture–engineering–construction. One of these important parameters is the project delivery…

Abstract

Purpose

Many parameters influence the success of sustainable projects (SPs) in the architecture–engineering–construction. One of these important parameters is the project delivery attributes (PDA), which are influenced by the project delivery system (PDS) while affecting the selection of it. This study aims to evaluate the significance of PDAs in influencing both the performance and success of SPs in Turkey, where the interest in SPs is high.

Design/methodology/approach

The impact of PDAs was determined by applying the two-round Delphi method with a semistructured interview involving the main stakeholders of a construction project, like owners, designers, contractors and consultants who played active roles in SPs, as well as academics to theoretically evaluate the issue. The significance of PDAs was assessed using the relative importance index, and the results were validated using the interrater agreement analysis.

Findings

The study identified key PDAs impacting SPs as owner character, commitment and motivation; simulation and energy modelling; and timing of stakeholders/early involvement.

Originality/value

The investigation of the significance of the PDAs is a lesser-studied context. Therefore, a research framework that enables an effective set of methods for solving the sectoral problems of PDAs that have impacts on SPs has been proposed. The framework is expected to open new opportunities for the generation and regulation of the PDSs for SPs. The findings will provide valuable insights to project stakeholders, particularly owners, local authorities and policymakers to assess which PDAs have a greater impact on sustainability performance when setting PDSs in SPs in other developing countries.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 15 April 2024

Tennakoon Mudiyanselage Maheshi Pabasara Tennakoon, Nicholas Chileshe, Raufdeen Rameezdeen, J. Jorge Ochoa and Aparna Samaraweera

Offsite construction (OC) is an efficient method to reduce waste in the construction industry from a circular economy perspective. Yet, its uptake is subdued by the ambiguities…

Abstract

Purpose

Offsite construction (OC) is an efficient method to reduce waste in the construction industry from a circular economy perspective. Yet, its uptake is subdued by the ambiguities around its supply chain. Hence, the purpose of this study is twofold: to identify the OC project delivery models, the limitations in their procurement approach to facilitate the resilience of the supply chain and interventions to promote supply chain resilience (SCR) and to identify the gaps in the existing procurement process and propose further research areas that implement strategies to improve SCR.

Design/methodology/approach

The study was conducted as a systematic literature review. In total, 41 peer-reviewed research papers published between 2013 and 2023 were shortlisted through the preferred reporting items for systematic reviews and meta-analysis guidelines. A descriptive analysis was conducted, followed by a thematic analysis.

Findings

The descriptive analysis reveals that the emphasis on digitising OC has shifted to transforming the business model, procurement and supply chain with a human-centric view. In thematic analysis, the predictability of the SC partners and the probabilities of evaluating the prospects are revealed as arbitrary characteristics in the current procurement strategies. Rewarding collaborative relationships among SC partners and incorporating provisions to postpone the module delivery are some interventions to promote flexibility. Drafting comprehensive and effective contracts that address transparency issues and facilitating the need for continuous development of capabilities through procurement are among the further research avenues proposed.

Originality/value

This study is a precursor demonstrating the potential of the procurement process to implement the decrees of SCR for better goal congruence of the OC supply chain.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 30 May 2024

Taofeeq Durojaye Moshood, James O.B. Rotimi, Wajiha Shahzad and Maruf Gbadebo Salimon

Over the past two decades, the construction sector has experienced a surge in projects fueled by substantial government investment in infrastructure. However, amid this growth…

Abstract

Purpose

Over the past two decades, the construction sector has experienced a surge in projects fueled by substantial government investment in infrastructure. However, amid this growth, the industry grapples with persistent challenges. Meeting project deadlines and budgets remains a struggle, impacting the industry’s credibility. Therefore, this research intends to investigate the idea of lean construction in the construction sector and look at the obstacles facing the construction industry in implementing lean construction strategies.

Design/methodology/approach

The insights presented here result from content analysis performed on 206 articles, while the metadata analysis is based on 891 publications.

Findings

This study highlights numerous important characteristics that influence an organization’s capacity to accomplish lean construction using a systematic literature review approach.

Research limitations/implications

For forthcoming research seeking validation, utilizing a mixed-method approach could prove advantageous. Yet, it is crucial to recognize the constraints of the present study, primarily centered on the scope of the literature review.

Practical implications

This assessment will enhance comprehension of the lean construction concept, potentially encouraging the adopting of lean construction practices. Moreover, it could provide insights into effectively applying these methods in practice.

Originality/value

The literature review highlights the necessity for organizations to identify and address potential challenges they might encounter in implementing lean construction. An essential step in overcoming these obstacles involves exploring the concept of lean construction within the sector and assessing the hurdles constraining the implementation of lean construction strategies in the construction industry.

Details

Technological Sustainability, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2754-1312

Keywords

Article
Publication date: 22 March 2024

Ramgy Pararajasingam, Anuradha Samarajeewa Waidyasekara and Hasith Chathuranga Victar

Construction material management plays a significant role in achieving successful project delivery of a construction project. However, ineffective material management is a…

Abstract

Purpose

Construction material management plays a significant role in achieving successful project delivery of a construction project. However, ineffective material management is a critical issue in the construction industry, especially in developing economies, of which Sri Lanka is not an exception. Therefore, this study aims to focus on exploring the causes of ineffective material management practices in civil engineering construction projects in Sri Lanka and their impact on successful project delivery.

Design/methodology/approach

Furthermore, the literature findings were validated through the preliminary survey. Subsequently, a quantitative research approach was adopted to pursue the research aim. Questionnaire responses were obtained from 215 construction professionals in civil engineering projects who were selected using the judgemental and snowball sampling techniques. Collected data were analysed through Statistical Package for the Social Sciences (SPSS) V26 and Microsoft Excel 2016.

Findings

Moreover, the study revealed that material price fluctuation, shortage of material in the market, delay in material procurement, inadequate planning and delays in material delivery are the most frequent causes of ineffective material management in civil engineering projects. In addition, it was evidenced that most ineffective material management practices cause both time and cost overruns in civil engineering construction projects. Most respondents emphasized inadequate planning, inadequate qualified and experienced staff, lack of supervision and lack of leadership as the causes for both time and cost overruns.

Originality/value

The study was concluded by proposing strategies for effective material management. Education/training/enlightenment of staff in charge of materials management, use of software like Microsoft Project, Primavera and similar software to eliminate manual errors in material management, and providing clear specifications to suppliers were the most agreed strategies for effective material management in civil engineering construction projects.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

1 – 10 of over 2000