1 – 10 of over 4000Haiyan Xie, Ying Hong, Mengyang Xin, Ioannis Brilakis and Owen Shi
The purpose of this study is to improve communication success through barrier identification and analysis so that the identified barriers can help project teams establish…
Abstract
Purpose
The purpose of this study is to improve communication success through barrier identification and analysis so that the identified barriers can help project teams establish effective information-exchange strategies.
Design/methodology/approach
The recent publications on construction communication about time management are reviewed. Then, the semi-structured interviews are performed with both questionnaires and audio recordings (n1 = 18). Next, the collected data are analyzed using both statistical measures on the questionnaire survey and qualitative coding analysis on the text transcripts from an audio recording. Particularly, the identified barriers are substantiated using a scientometrics approach based on the published articles (2011–2020, n2 = 52,915) for purposeful information-sharing solutions in construction time management. Furthermore, the intervention strategies from the top 10 most-cited articles are analyzed and validated by comparisons with the results from construction surveys and relevant studies.
Findings
Based on the discussed communication difficulties, five main barriers were identified during time-cost risk management: probability and statistical concepts, availability of data from external resources, details of team member experiences, graphics (and graphical presentation skills), and spatial and temporal (a.k.a. 4D) simulation skills. For the improvement of communication skills and presentation quality regarding probability and statistical concepts, project teams should emphasize context awareness, case studies and group discussions. Details of communication techniques can be adjusted based on the backgrounds, experiences and expectations of team members.
Research limitations/implications
The dataset n1 has both size and duration limits because of the availability of the invited industry professionals. The dataset n2 considers the literature from 2011 to 2020. Any before-the-date and unpublished studies are not included in the study.
Practical implications
A thorough comprehension of communication barriers can help project teams develop speaking, writing and analytical thinking skills that will enable the teams to better deliver ideas, thoughts and meanings. Additionally, the established discussion on barrier-removal strategies may enhance time management effectiveness, reduce project delays, avoid confusion and misunderstanding and save rework costs.
Social implications
This research calls for the awareness of communication barriers in construction project execution and team collaboration. The identified barriers and the established solutions enrich the approaches of construction companies to share information with communities and society.
Originality/value
This is the first identification model for communication barriers in the time management of the construction industry to the authors' knowledge. The influencing factors and the countermeasures of communication difficulties highlighted by the research were not examined systematically and holistically in previous studies. The findings provide a new approach to facilitate the development of powerful communication strategies and to improve project execution.
Details
Keywords
Mohamed Elkbuli, Nurhidayah Azmy and Chia Kuang Lee
Although there has been an increase in the application of a variety of robust technologies and systems, the oil and gas sector relies on project managers’ soft skills for success…
Abstract
Purpose
Although there has been an increase in the application of a variety of robust technologies and systems, the oil and gas sector relies on project managers’ soft skills for success because of their vital role. Therefore, this study aims to explore the profound influence of project managers’ soft communication skills on successful risk management within Libya’s oil and gas projects.
Design/methodology/approach
A review of relevant literature and a quantitative approach through the administration of a questionnaire were used to determine factors impacting risk management implementation related to managerial communication skills. A total of 246 valid responses were received from the oil and gas companies in Tripoli, Libya. Partial least squares structural equation modelling was used to examine the direct and moderating relationship drawn by the hypotheses.
Findings
The findings suggest that managerial soft skills may be used to improve continuous risk management processes and intra-project communication. It was found that the experience is strengthening the positive relationship between written communication soft skills and project risk management implementation among Libyan oil and gas construction projects.
Originality/value
This study defines project managers’ soft communication skills and analyzes project managers’ soft communication skills with the role of experience as a moderator. This paper presents a valuable contribution by offering original insights tailored explicitly to the Libyan context. The information presented in this paper is relevant to project managers operating within the oil and gas industry. It also offers a novel approach to risk management in the Libyan oil and gas industry that can improve project efficiency and effectiveness.
Details
Keywords
Justice Williams, Frank Fugar, Emmanuel Adinyira and Kofi Agyekum
Effective safety communication facilitates the sharing of relevant knowledge that helps to improve safety behaviours, such as superior hazard identification and compliance. This…
Abstract
Purpose
Effective safety communication facilitates the sharing of relevant knowledge that helps to improve safety behaviours, such as superior hazard identification and compliance. This study aims to explore channels by which construction companies can effectively communicate health and safety (H&S) among communities of their operations.
Design/methodology/approach
Based on a quantitative research approach, this study addressed the knowledge gap through a cross-sectional survey of 250 contractors (comprising 155 building and 95 road contractors) involved in various projects in the Ghanaian construction industry. These contractors were selected by using a stratified simple random sampling technique. Data obtained from the survey was analysed through descriptive (i.e. frequencies, mean and standard deviation) and inferential (i.e. exploratory factor analysis) statistical analyses.
Findings
The findings from the mean scores revealed that all the 12 communication channels identified in the literature, confirmed through piloting and examined by the respondents, were important channels through which construction companies can effectively communicate H&S amongst communities of their operations. The exploratory factor analysis revealed a clustering of the 12 channels of communication into 5 components: “safety demonstration in the community”; “social media”; “mass media”; “community engagement”; and “opinion leaders”.
Research limitations/implications
This study offers construction project managers the means of managing one of the major stakeholders of a construction project (the community). It provides an actionable opportunity that can be leveraged strategically to integrate community members into projects to promote synergy and local content inclusion while gaining a peaceful atmosphere to achieve their project goals.
Practical implications
Practically, this study provides construction project managers with a means of managing one of the major stakeholders of a construction project (the community) and also demonstrates the integration of community members into projects to promote synergy and local content inclusion. This would give construction organisations a peaceful atmosphere to accomplish their project objectives.
Social implications
The social implication of this study is that the study offers society a means of creating safer Ghanaian communities by offering them the knowledge of identifying hazards and avoiding risky behaviours, creating a good safety atmosphere in these communities.
Originality/value
This study presents construction organisations with a unique opportunity to transfer and share novel external knowledge within a different social system (the community). It contributes to the state-of-the-art knowledge in H&S communication by providing channels through which H&S can be communicated in a developing country such as Ghana.
Details
Keywords
Philip Tin Yun Lee, Alice Jing Lee, Michael Chau and Bingjie Deng
With the increasing agility of IT enterprises, it is crucial to identify suitable managerial strategies for controlling information system development (ISD) projects in the new…
Abstract
Purpose
With the increasing agility of IT enterprises, it is crucial to identify suitable managerial strategies for controlling information system development (ISD) projects in the new agile working environments. These environments are characterized by the collaborative nature of work and the recurring nature of communication. This study aims to explore how perceived transparency in ISD processes, controlled by transparency strategies, impacts project quality.
Design/methodology/approach
In collaboration with a firm that implemented a customized Scaled Agile Framework, questionnaires were distributed to employees involved in ISD projects. The goal was to understand the influence of perceived transparency in ISD processes on project quality.
Findings
Our research demonstrates that perceived transparency in ISD processes enhances project quality through knowledge exchange by strengthening goodwill trust among team members. Additionally, transparency improves project quality through client feedback by strengthening competence trust of clients toward the team. Goodwill trust of clients toward the team and competence trust among team members have less impact on project quality enhancement.
Originality/value
This study reveals the nomological network among the perceived transparency, different types of trust among stakeholders, social interactions among stakeholders, and project outcomes in agile ISD environments. This nomological network has been overlooked by previous studies that biased toward top-down, interorganizational communication. It highlights that not all types of trust among stakeholders are involved in the processes through which perceived transparency influences ISD project quality in agile working environments. Additionally, it exposes the limitations of transparency strategies for controlling projects in agile IT enterprises.
Details
Keywords
Janshid Ali Turi, Sami Al Kharusi, Muddasar Ghani Khwaja, Mohammad Rezaur Razzak and Shahid Bashir
This study aims to investigate the influence of requirement engineering (RE) on project performance (PP) in the context of NEOM* in Saudi Arabia. The study also aims to examine…
Abstract
Purpose
This study aims to investigate the influence of requirement engineering (RE) on project performance (PP) in the context of NEOM* in Saudi Arabia. The study also aims to examine the relationship between three components of RE, evolving market needs (ECN), market changes (MC) and technological advancements (TA), on PP, through the mediating influence of effective communication (EC), change readiness (CR) and stakeholder engagement (SE). Further, the study aims to examine the moderating effect of team cohesion (TC) on the RE–PP relationships.
Design/methodology/approach
A research framework is developed by drawing on the resource-based theory and with the support of empirical evidence and rational arguments to propose a set of hypotheses relating to the constructs in the framework. The hypotheses are tested through survey data collected from individual employees working on different projects across NEOM. A total of 336 useable responses were collected that were analyzed through covariance-based structural equation modeling using AMOS v.28.
Findings
The results show although ECN and TA both have a positive impact on PP, MC had no significant relationship with PP. In terms of the mediation hypotheses, EC, CR and SE all partially mediate the relationships between ECN and TA with PP. However, there was no mediating effect in the relationship between MC and PP. Moreover, EC, CR and SE themselves have a significant positive influence on PP. Finally, TC proved to be a significant moderator between ECN and PP and TA and PP, but not in the case of MC and PP.
Originality/value
This study makes three novel contributions. First, most prior empirical studies examined the overall impact of RE on PP; however, the current study provides a more nuanced insight into the relationships between the three components of RE (i.e. ECN, MC and TA) and PP. Second, the mediating roles of EC, CR and SE between components of RE and PP present a finer-grained understanding of how project resources are linked to project success goals through features of the project team. Third, moderating influence of TC with regard to a higher possibility of success for projects are highlighted through this discovery.
Details
Keywords
Kangning Liu, Bon-Gang Hwang, Jianyao Jia, Qingpeng Man and Shoujian Zhang
Informal learning networks are critical to response to calls for practitioners to reskill and upskill in off-site construction projects. With the transition to the coronavirus…
Abstract
Purpose
Informal learning networks are critical to response to calls for practitioners to reskill and upskill in off-site construction projects. With the transition to the coronavirus disease 2019 (COVID-19) pandemic, social media-enabled online knowledge communities play an increasingly important role in acquiring and disseminating off-site construction knowledge. Proximity has been identified as a key factor in facilitating interactive learning, yet which type of proximity is effective in promoting online and offline knowledge exchange remains unclear. This study takes a relational view to explore the proximity-related antecedents of online and offline learning networks in off-site construction projects, while also examining the subtle differences in the networks' structural patterns.
Design/methodology/approach
Five types of proximity (physical, organizational, social, cognitive and personal) between projects members are conceptualized in the theoretical model. Drawing on social foci theory and homophily theory, the research hypotheses are proposed. To test these hypotheses, empirical case studies were conducted on two off-site construction projects during the COVID-19 pandemic. Valid relational data provided by 99 and 145 project members were collected using semi-structured interviews and sociometric questionnaires. Subsequently, multivariate exponential random graph models were developed.
Findings
The results show a discrepancy arise in the structural patterns between online and offline learning networks. Offline learning is found to be more strongly influenced by proximity factors than online learning. Specifically, physical, organizational and social proximity are found to be significant predictors of offline knowledge exchange. Cognitive proximity has a negative relationship with offline knowledge exchange but is positively related to online knowledge exchange. Regarding personal proximity, the study found that the homophily effect of hierarchical status merely emerges in offline learning networks. Online knowledge communities amplify the receiver effect of tenure. Furthermore, there appears to be a complementary relationship between online and offline learning networks.
Originality/value
Proximity offers a novel relational perspective for understanding the formation of knowledge exchange connections. This study enriches the literature on informal learning within project teams by revealing how different types of proximity shape learning networks across different channels in off-site construction projects.
Details
Keywords
Shuvo Dip Datta, Md. Habibur Rahman Sobuz, Mohammad Nafe Assafi, Norsuzailina Mohamed Sutan, Md. Nazrul Islam, Maria Binte Mannan, Abu Sayed Mohammad Akid and Noor Md. Sadiqul Hasan
This paper aims to identify the critical project management success factors and analyze those factors to achieve a sustainable construction industry in Bangladesh.
Abstract
Purpose
This paper aims to identify the critical project management success factors and analyze those factors to achieve a sustainable construction industry in Bangladesh.
Design/methodology/approach
This study identified 41 major problematic factors from the related literature. In this research, a detailed questionnaire survey was conducted among the experts and stakeholders of the construction industry of Bangladesh. The survey was carried out on a Likert scale and ranked the critical factors using the relative importance index (RII). The 41 problematic factors were divided into five group factors and ranked by the RII index to prioritize the factors. Finally, stakeholders' opinions were analyzed with the critical assessed factors, which was a very effective technique to eliminate the risks and uncertain occurrences in the construction industry of Bangladesh.
Findings
The factors analysis revealed that cost overrun, traffic jam, low wedges, slow payment for completed works and financial issues of the owner were leading critical factors in construction projects. Moreover, the critical factors are divided into five-factor groups, namely, financial management, monitoring and feedback, competency management, communication and coordination management, and risk management, which exhibit 0.767, 0.720, 0.711, 0.710 and 0.658 RII values. After all, the stakeholders' opinion suggested that implementing modern tools and techniques can help to avoid the critical situation in the construction industry of Bangladesh.
Practical implications
The construction industry of Bangladesh is moving away from stable construction work day by day. Previously, the potential CSFs were discussed unstructured way. Hence, detecting early warning signals in a structured way has become necessary for the building firm's survival.
Originality/value
Though some scattered critical issues are discussed in different literature, the critical issues of the Bangladeshi construction industry were not investigated extensively. Therefore, this study finds out the potential critical issues of the construction industry of Bangladesh to accumulate such harmful construction issues in a single platform so that the construction industry can have an overview of them with the help of innovative technologies.
Details
Keywords
Sepani Senaratne, Abhishek KC and Siryana Rai
Megaprojects are financially large and complex in scope, which require engagement of stakeholders from various institution and communities. With increased concerns from…
Abstract
Purpose
Megaprojects are financially large and complex in scope, which require engagement of stakeholders from various institution and communities. With increased concerns from stakeholders on sustainability related issues, from environmental to socio-economic perspective, managing megaprojects has become quite challenging. Hence, there should be proactive approaches in active engagement of stakeholders from the start of the projects to overcome such issues. Currently, there is a knowledge gap on stakeholder management strategies specific to megaprojects on managing sustainability issues.
Design/methodology/approach
This research has adopted review of secondary data from case studies to identify stakeholder management challenges and strategies in megaprojects around Sydney area. The documents related to three different projects were reviewed and data were collected through qualitative content analysis and coding with use of NVivo software for within case analysis and was followed by thematic approach for cross case analysis.
Findings
Every case study project's sustainability-related stakeholder issues are more similar than different to others. Differences are mostly in terms of intensity of impact of any issue in a particular project, and/or intensity of impact at certain phase of any project. Moreover, significant sectors and strategies have been identified for key focus to manage environment and socioeconomic issues. Whatever be the strategies, in case of megaprojects, they need to be mostly proactive.
Originality/value
This research has extended the knowledge on stakeholder management, in relation to managing sustainability-related issues of megaprojects during their design, construction and operation phases. This research offers useful strategies for project teams of megaprojects to develop a proactive stakeholder management plan, addressing unavoidable sustainability challenges.
Details
Keywords
As climate change has become a growing concern, sustainable development has become increasingly important. Emissions reduction is a key step for more efficient energy use. In the…
Abstract
Purpose
As climate change has become a growing concern, sustainable development has become increasingly important. Emissions reduction is a key step for more efficient energy use. In the last few years, the residential building sector in Croatia has received financial support for multi-dwelling building energy efficiency retrofits (EERs). However, some of these projects encountered difficulties due to information asymmetry between the key participants. This study aims to address the problem from the perspective of the principal-agent theory, which is concerned with information asymmetry and the asymmetry's repercussions.
Design/methodology/approach
A social network analysis is conducted to reflect the operation and management (OM) details of Croatian multi-dwelling buildings. The key stakeholders of EER are mapped, along with the contractual and communication ties between them. Using the Gephi software, relationship data are visually represented and statistically evaluated.
Findings
The analysis indicated two different clusters or groups of stakeholders in EERs in Croatia and enabled the mapping of key relationships between stakeholders. The findings stress the importance of the key relationship between owner representatives (ORs) and property managers (PMs).
Originality/value
The contribution of this study is the development of framework for blockchain implementation in EERs, which can be adapted for use in different markets and/or projects. Blockchain is proposed for minimization of information asymmetry between different stakeholders. Blockchain enables communication and cooperation during project development and enhances trust among stakeholders.
Details
Keywords
The administration of a contract by the architect is necessary to ensure the contract is performed according to the conditions of the contract, compliance with related laws and…
Abstract
Purpose
The administration of a contract by the architect is necessary to ensure the contract is performed according to the conditions of the contract, compliance with related laws and the practices of the construction industry. With the increasing number of housing projects and the limited number of registered architects in the nation, the architect is unable to be hands-on with every project. Hence, the involvement of graduate architects to reduce the workload in building contract administration (BCA) is required. The purpose of this paper is to develop a BCA framework for graduate architects to enhance their work performance in BCA work and to assist them in moving a step closer to acquiring their professional qualifications.
Design/methodology/approach
This study adopted a qualitative method where seven housing projects in Malaysia were selected as case studies to conduct documentation reviews and semistructured interviews. The data collected was analyzed using content analysis to develop the BCA framework. Focus groups were used to validate the framework.
Findings
This study summarized there are 5 themes (claims and legal matters management, project management, communication and relationship management, quality assessment and management, and design management) and 11 sub-themes (authority matters, building certification, meetings, coordination checklist, letter-writing, contract documentation, building material, design brief, building sustainability and workmanship quality standard, contractor’s submission and building details) that need to be improved by graduate architects in BCA work.
Originality/value
The contribution of this study to the existing knowledge is the development of a BCA framework that enables graduate architects to get a glimpse of architectural professional practice in reality and better prepare them to confront and resolve problems. Besides, the proposed framework could be incorporated into a pedagogy focusing on methods to support construction contract administrators.